A swimming pool is mostly invisible work: excavation, structure, drainage, pipework, plant and power. The tiles and the water are the part you see. Planning it well means thinking about all of it together, along with the planning rules and the garden around it.
Do you need planning permission?
A swimming pool in the garden of a house, and a building to house it, can often be built without a planning application, under the permitted development rules for outbuildings. The main conditions are:
- it must not be in front of the main elevation of the house;
- a pool building must be single storey, no more than 2.5 metres high at the eaves, and no more than 4 metres high with a dual-pitched roof (3 metres otherwise);
- within 2 metres of a boundary, the whole building must be no more than 2.5 metres high;
- pools, outbuildings and extensions together must not cover more than half of the land around the original house; and
- it must be for use incidental to the house, so not a separate dwelling.
In a conservation area, a pool building between the side of the house and the boundary needs planning permission. In a National Landscape (formerly an Area of Outstanding Natural Beauty), outbuildings more than 20 metres from the house are limited to 10 square metres. Listed houses and flats have no permitted development rights for this. The Green Belt does not remove these rights, which is why many pools in Surrey are built without an application.
Building regulations
The pool itself is not covered by the building regulations, but the electrics, drainage and any building around it are. A pool house over 30 square metres needs full building regulations approval. Smaller outbuildings can be exempt, depending on their size, their distance from the boundary and what they are built of. Indoor pools inside an extension or basement are always part of the building regulations application.
Outdoor or indoor?
An outdoor pool is simpler to build and sits within a terrace in the garden. Heating extends the season, and a cover keeps the heat in and the debris out.
An indoor pool can be used all year, but the building around it must handle warm, humid air. That means proper ventilation and dehumidification, a vapour control layer in the walls and roof, and finishes that will not suffer from moisture. Most of the long-term problems with indoor pools come from getting this wrong.
What goes into building one
- Survey and design: the ground conditions and water table, access for machinery, where the spoil will go, and the position of the plant room.
- Excavation: often the biggest single cost on a tight site, because every lorry load has to leave through the front.
- Structure: a pool shell designed by an engineer for the soil and the water it holds.
- Plant and pipework: filtration, water treatment and heating, with the pipework laid before backfilling.
- Finishes: tiles or liner, coping and the cover.
- Surroundings: the terrace, drainage, lighting and planting, so the pool and garden are finished together.
Running costs
Heating is the main running cost. A heat pump, a good cover and an insulated pool shell make the biggest difference. For indoor pools, the dehumidification system matters just as much.
We design and build pools, pool houses and the landscaping around them with our own team, not a subcontracted pool company. Every pool is priced from the drawings after a survey of the garden.