A commercial fit-out, whether an office, a shop or a restaurant, has more parties involved than a house: a landlord, often a managing agent, building control, the fire authority’s expectations and, if you are trading, your customers. Most delays come from consents and decisions that were left too late. This is what to plan before work starts.
The lease and the landlord
Most commercial leases require the landlord’s written consent before alterations. The landlord will usually want drawings, a method statement, the contractor’s insurance details, and sometimes their own surveyor to review the design. Ask what they need at the start, because a licence for alterations can take weeks. Check too what the lease says about reinstatement at the end of the term.
Planning and use class
Since September 2020, shops, restaurants, offices, gyms and many other commercial uses fall within a single use class, Class E. Changing between uses inside Class E does not need planning permission. Changes outside it, external alterations such as a new shopfront, signage and extraction flues for kitchens often do. In conservation areas, shopfront changes are looked at closely.
Building regulations
A fit-out that changes the layout, the means of escape, the ventilation or the toilets needs building regulations approval. Fire safety is the main concern: escape routes, fire doors, compartmentation, emergency lighting and alarms all have to suit the way the space will be used. Accessibility rules apply to new toilets and entrances. Building control signs the work off at the end.
Fire safety once you are open
Under the Regulatory Reform (Fire Safety) Order 2005, the person responsible for the premises must carry out a fire risk assessment and keep it up to date. Design the fit-out with that assessment in mind, and update it when the work is finished.
Health and safety on site
The Construction (Design and Management) Regulations 2015 give commercial clients specific duties: appointing a principal designer and principal contractor where more than one contractor is involved, and making sure the work is planned and managed safely. Larger projects, those lasting more than 30 working days with more than 20 workers on site at once, or exceeding 500 person-days, must also be notified to the Health and Safety Executive.
Working around the business
If the premises stay open, the programme has to fit your trading: noisy work out of hours, phased handovers of areas, dust screens, and clear routes for customers and staff. In shared buildings, the managing agent will set working hours and rules for using lifts and loading bays. Agree all of this before the start date, and build it into the price.
Services
Commercial spaces need more power, data and ventilation than homes, and restaurants need kitchen extraction and grease management. Survey the existing supplies early. An increased electricity supply or a new gas meter can take longer to arrange than the fit-out itself.