South London Commercial Builders: Shops, Offices, Mixed Use

Right Choice Builders takes on commercial building work across South London for two kinds of client…

The business or landlord that owns or leases the premises, and the larger construction company that keeps us on its supply chain as a preferred supplier.

Either way the job is built by our own trades, run around your trading hours and your tenants, carried out under the CDM, fire and building control duties that apply to commercial premises, and priced in nine itemised sections with VAT shown, backed by £10m of professional indemnity and £5m of public liability cover.

Send the drawings or the tender and the itemised price comes back within one working day; without them, the site visit fixes the scope and the programme first.

Send Your Tender or Drawings

Free to price and without obligation, anywhere across South London.

FMB inspected member. £10m professional indemnity, £5m public liability. Call 07551 003647.

Black timber garden room and storage shed exterior

Commercial Building Work by Our Own Trades, for Clients and Main Contractors

Right Choice Builders carries out commercial construction and refurbishment across South London, from Peckham and Lewisham to Croydon, Wimbledon and Sutton: shop and cafe fit-outs, office refurbishments, restaurant kitchens, clinics and surgeries, small industrial units, and the mixed-use buildings where a commercial unit sits under flats.

We work directly for businesses, landlords and developers, and as a preferred supplier to larger construction companies, with structure, roof, services and fit-out delivered by one team and a 12-month workmanship warranty on the work.

Mixed-use commercial building construction drawing Architectural elevation showing a ground-floor commercial unit with shopfront glazing and flats on the floors above. 3.0 m Upper flats Commercial unit New shopfront 04 ELEVATION Commercial Works RCB-C004 NTS · REV A

The Premises We Work In, From Shop Floors to Mixed Use Buildings

Commercial buildings ask different things of the same trades. Open each type below to see how the work changes from shops and restaurants to offices, clinics, industrial units and mixed-use buildings.

Tap a card to read the detail. Swipe sideways, or use the arrows, to move through the premises types.

01

Retail & Hospitality

Shop fronts, cafes, restaurants and back-of-house spaces Read more Close

Retail and hospitality first, because they are the commercial jobs South London has most of: shop fit-outs and refits, new shop fronts with the structural opening behind them, cafes and restaurants, where the job is an extraction and gas installation before it is a fit-out, and the washrooms, kitchens and staff areas behind the counter.

02

Offices & Professional Premises

Partitions, ceilings, services and washrooms Read more Close

Offices and professional premises next, from a solicitor's ground floor to a serviced office floor, with the partitions, ceilings, data and power, air conditioning and washrooms that a modern lease expects.

03

Cat A to Cat B

Landlord finish separated from the tenant fit-out Read more Close

Where the lease uses the terms, we take a floor from shell or Cat A, the landlord's basic finish with ceilings, lighting, air conditioning and raised floors, to Cat B, the tenant's fit-out with partitions, meeting rooms, tea points and data, and we price the two as separate sections so a landlord's contribution can be set against the right one.

04

Clinics & Community Buildings

Accessibility, fire and infection control shape the design Read more Close

Clinics, dental surgeries, nurseries and community buildings, where accessibility, fire and infection control decide the design.

05

Industrial Units & Workshops

Mezzanines, shutters, yards and commercial roofs Read more Close

Small industrial units and workshops, with the mezzanines, roller shutters, yards and roofs that come with them.

06

Mixed Use Buildings

Commercial unit, flats and roof handled as one job Read more Close

Mixed-use buildings are where a general builder earns its place, because a shop with flats above is a fire strategy, a party structure and two sets of tenants before it is a refurbishment, and we handle the commercial unit, the flats above it and the roof over both as one job.

Where the work is structural, a new opening in a shop front or a floor taken out for a mezzanine, the structural work is designed by the engineer we work with and inspected by building control, and where the building needs a new roof the commercial roof is priced in the same programme.

Modern double basin bathroom renovation completed by Right Choice Builders

Direct to the Business, or as a Preferred Supplier to Main Contractors

One site visit, one itemised quote, one project manager.

Discuss Your Project
  • Direct contractor for businesses, landlords and developers
  • Preferred supplier to larger construction companies
  • Own Gas Safe and NAPIT trades · £10m PI cover · 28-year record
Contractor routes & supplier details
Direct client

For a business, a landlord or a developer we are the contractor: one site visit, one itemised quote, one project manager, and the building control, CDM and fire duties carried in the contract.

Main contractor

For a larger construction company we are the subcontractor that turns up with its RAMS written, its inductions done, its trades certified and its construction phase plan ready, works to the main contractor's programme and site rules, and invoices against the agreed valuations with retention where the subcontract sets it.

Preferred supplier

Several main contractors keep us as a preferred supplier for exactly that reason: a firm with its own Gas Safe and NAPIT trades, £10m of professional indemnity cover and a 28-year record is one less package to manage.

What Our Customers Say on Google

Every review below comes straight from our Google Business Profile, in the customer's own words.

Posted on Google Google
Stacy profile picture
Stacy
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
It is always hard to find a reliable and trust worthy tradesman! you hear so many stories about cowboy builders and it puts you off getting work done. Sami was recommended to me by a friend who he had worked for before. I am so glad that I was put in touch with him! the work was completed within the time frame, under the budget and more importantly to an exceptional standard!
Posted on Google Google
Eric Fox’s profile picture
Eric Fox’s
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Sam and his team built our loft extension to a high standard. They involved the building inspectors at every step of the way, and creatively found solutions to unexpected problems. They are very skilled, and worked with great professionalism - arriving on time every day, and keeping the lines of communication clear.
Posted on Google Google
clive stewart profile picture
clive stewart
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Right choice builders did an excellent job on my kitchen renovation they were very approachable and kept me informed at every stage 👍
Posted on Google Google
Mei Wong profile picture
Mei Wong
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We recently had our loft converted and home renovated by Right Choice Builders, and we’re extremely happy with the results. The team was reliable, efficient, and completed the work to a high standard. Communication was clear throughout, and they kept everything tidy and on schedule. The finished space looks fantastic – solid workmanship and great attention to detail. Highly recommend for anyone looking for a trustworthy and skilled building team.
Posted on Google Google
Mariam Layla Yahya profile picture
Mariam Layla Yahya
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
So happy with the renovation work done by Sami. New kitchen, bathroom, and the knocked through walls have completely transformed the space. He was friendly, reliable, and really paid attention to detail. It honestly feels like a brand new home, deffo five stars!

Built Around Your Trading Hours and Your Tenants

Structural alterations architectural drawing showing steelwork and a new structural opening

On a commercial job the programme is the product, because every day the shop is closed or the office is empty is lost trading, so the sequence is built from the reopening date backwards.

The programme changes according to whether the premises stay open, close for the fit-out, have residential tenants above them or are being handed back at the end of a lease.

Trading While the Premises Stay Open

Trading hours

Where the premises stay open, the noisy and dusty work is done out of hours or in a sealed zone, the trading area is protected and cleaned before opening each day, and deliveries and skips are timed around the street and the neighbours, who are told the programme before the first van arrives.

When the Premises Close for the Fit-Out

Reopening date

Where the premises close, the programme is agreed in writing before the fit-out starts, with the long lead items, shop fronts, extraction, air conditioning and joinery, ordered against it.

Landlords, Common Parts and Residential Tenants

Occupied buildings

For landlords and asset managers the same care goes into the tenants: the common parts stay open and clean, the residential tenants above a commercial unit know the hours and the days, and the work is phased so the service charge is not spent on a second mobilisation.

Lease Handovers, Moves and Dilapidations

One programme

Where a lease is ending, the dilapidations are priced against the schedule of condition and done as one job, so the premises are handed back once.

Where you are moving, the new premises are fitted out and the old ones handed back on one programme, so the dilapidations on the lease you are leaving run straight after the move rather than after a second tender.

Completed brick rear extension with bifold doors

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

CDM, Fire Safety and Access: Who Carries What

Landlord consent comes first

Before any of that, a tenant needs the landlord's written consent, usually a licence for alterations that annexes the drawings, sets the conditions and says what must be reinstated at the end of the lease.

We produce the drawings and specification the licence needs and build to them, so the works match the consent.

HSE F10 notification — if either threshold is met
30+ working days And more than 20 people on site at once
500+ person-days Total project labour
Four compliance sections

CDM 2015: Roles, Site Plan and HSE Notification

Construction duties
Client · Principal Designer · Principal Contractor

Commercial work carries duties a home extension does not. Under the Construction (Design and Management) Regulations 2015 every project has a client, a principal designer and a principal contractor, a construction phase plan has to exist before work starts, and a health and safety file is handed over at the end; where the job will run more than 30 working days with more than 20 people on site at once, or beyond 500 person days, it is notified to the HSE on an F10 before it starts and the notice is displayed on site.

The HSE sets out the commercial client's duties, and we act as principal contractor and submit the notification on your behalf where you ask us to.

Fire Strategy, Escape Routes and Compartmentation

Fire Safety Order
Responsible person

Fire safety in a commercial building sits with the responsible person under the Fire Safety Order, so the fire strategy, escape routes, compartmentation, detection and the separation between a shop and the flats above are designed in with the layout and not argued about at the fire risk assessment.

Part M Access and Building Control Sign-Off

Access & inspection
Entrances · Thresholds · Washrooms

Accessibility under Part M shapes entrances, thresholds, counters and washrooms in any premises the public uses. Building control inspects the structural, fire and drainage work and issues the completion certificate.

Change of Use, Prior Approval and Planning

Planning route
One design & build contract

Where the use of the building is changing, from a shop to flats or from offices to a clinic, the planning route, including prior approval where it applies, runs under one contract for the drawings and the application (design and build).

Exterior render being installed with scaffolding on a Greater London building

Send the site details, get a price

Share photos or plans of the unit and tell us what needs doing. We reply with a written price and book your free site visit within 24 hours.

Get your commercial price

Or call 07551 003647, every day 9am to 5pm.

Your Commercial Quote, Itemised and Ready for Your Accountant

The quote arrives within one working day of your drawings or tender and runs to nine sections in build order.

VAT is shown as its own line at the rate that applies, which matters to a business that reclaims it, and the insurance certificates, company number and VAT number are on the first page for your procurement file.

Rear extension groundwork and blockwork construction by Right Choice Builders
Itemised in build order
The nine sections of your commercial quote
  • Strip out and site set-up
  • Structural work
  • Roof and envelope
  • First fix mechanical and electrical
  • Partitions and ceilings
  • Fit-out and joinery
  • Washrooms and kitchens
  • Finishes and decoration
  • Compliance and certification
What moves the price

What moves the price is the fit-out specification first, then the structural and services work, then the fire and access measures the premises need, then out of hours working, and finally access and the street.

01 Fit-out specification
02 Structural and services work
03 Fire and access measures
04 Out of hours working
05 Access and the street
VAT, Insurance and Procurement Details

VAT is shown as its own line at the rate that applies, which matters to a business that reclaims it, and the insurance certificates, company number and VAT number are on the first page for your procurement file.

Improvement Relief and Business Rates

One line worth knowing: since April 2024 qualifying improvements to occupied premises can have the resulting rise in business rates deferred for 12 months under improvement relief, applied for through the council, and the itemised quote gives your rates adviser the figures to do it with.

How a Commercial Job Runs From Site Visit to Handover

  1. A Site Visit That Fixes the Scope and the Reopening Date

    We walk the premises with you, agree what the job includes, note the trading hours, the neighbours and the access, and set the date the business needs to be back in.

  2. Drawings, Permissions and the Construction Phase Plan

    Drawings and any planning or building control applications run under one contract or from yours, the fire strategy is agreed, and the construction phase plan, RAMS and any F10 are prepared before the start.

  3. Your Itemised Quote Within One Working Day

    Nine sections, VAT shown, the programme in writing and the long lead items ordered against it.

  4. The Build, Sequenced Around Trading

    Structure, services and fit-out run in sequence by our own trades, outside the hours when the premises trade, with building control inspecting the structural, fire and drainage work as it goes in.

  5. Handover With the File

    You receive the completion certificate, the electrical and gas certificates, the health and safety file and a 12-month workmanship warranty, on the date the programme said.

South East London luxury bathroom renovation with black fittings
Proof of work

See Our Commercial and Mixed Use Work

Our portfolio includes a commercial project alongside the full refurbishments in Lewisham, Sutton and Surbiton and the extensions and lofts across South London that use the same trades. Customers on Checkatrade and Bark describe a team that turned up every day, involved the building inspector at each stage and finished within the agreed time and budget.

Independently reviewed

Our rating stands at 5 stars on Google and 9.71 out of 10 on Checkatrade.

  • 5 stars Google
  • 9.71 out of 10 Checkatrade
Named in reviews

Those reviews name Sami, who leads the team on site.

Commercial Building Work Across South London, Surrey and Kent

We work on commercial premises across South London and Surrey, from the town centres of Wimbledon, Richmond and Surbiton to Fulham, South Croydon, Epsom, Reigate and Guildford.

Where the job includes the washrooms and kitchens behind the trading area, they are fitted by our own plumbers and electricians under the same programme.

Questions Businesses and Landlords Ask Before Appointing a Builder

Can You Work Out of Hours While We Trade?

Yes. Noisy and dusty work is done outside trading hours or in a sealed zone, the trading area is protected and cleaned before opening, and the programme is written around your hours before the job starts.

Who Is the Principal Contractor Under CDM?

We are, on the jobs where we hold the contract, with the construction phase plan prepared before the start and the F10 notification submitted on your behalf where the job is notifiable. On a main contractor's site we work to their plan as a subcontractor.

Do You Handle Building Control and Fire Regulations?

Yes. Building control is notified and inspects the structural, fire and drainage work, the fire strategy is designed in with the layout, and the completion certificate and the health and safety file are handed over at the end.

Can You Convert Commercial Premises to Flats?

Yes. The planning route, including the prior approval route where it applies, runs under one contract with the drawings, and the conversion is built to the fire, sound and access standards flats require, with the commercial unit below finished in the same programme.

Do You Work as a Subcontractor for Main Contractors?

Yes, and several keep us as a preferred supplier. We arrive with RAMS, inductions and certified trades, work to the main contractor's programme and site rules, and invoice against agreed valuations with retention where the subcontract sets it.

How Is a Commercial Job Priced and Invoiced?

In nine itemised sections from your drawings or tender within one working day, with VAT shown as its own line and the insurance, company and VAT details on the first page, and invoiced against the programme agreed in writing.

Is there something else you would like to ask about your commercial project?

Ask Our Team

Request a Free Quote

Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

Or call 07551 003647
Construction drawings of multiple dwellings

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    The Programme Is the Product

    A commercial fit-out is judged on one date, the day the business is trading again, and everything on this page exists to hit it: the sequence built backwards from reopening, the long lead items ordered first, the trades that are ours, and the certificates that arrive with the keys. Give us the date and the drawings, and the programme comes back with the price.

    Tell us the premises, the reopening date and whether you are the business or the main contractor, and the site visit or the tender return follows.

    Call 07551 003647 WhatsApp Email or send your brief online

    Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office.

    Send Your Tender or Drawings Free to price, no obligation, and the programme is yours to keep.