Retail and Shop Fit-Outs in London and Surrey

Shop fit-outs from bare shell to opening day: shopfront, layout, lighting, counters and display, back-of-house and services, delivered to the date in your lease.…

In retail the opening date is fixed before the first trade arrives, often by the end of a rent-free period, so the programme matters as much as the finish. Shopfront approvals, landlord consent and long lead items like glazing and shutters have to be in hand early.

A visit to the unit can be booked within 24 hours of your call.

Book a Survey Within 24 Hours

Free and without obligation, anywhere across London and Surrey.

FMB inspected member. 28 years in the trade. Call 07551 003647.

Ground floor being opened up into one open plan space

A Shop Ready to Trade on the Day It Has To

We fit out shops and showrooms for independent retailers and growing brands across London and Surrey, on high streets from Wimbledon and Richmond to Guildford and Reigate. The work covers the shopfront and signage, the internal layout, flooring, lighting, counters and display, changing rooms where needed, toilets, storage and staff areas, and the services behind them.

Our own trades carry the building, electrical and plumbing work, and we coordinate the shopfitting joinery and specialist installers, so the shop is handed over clean, commissioned and ready to stock.

Ground floor stripped to the joists during a whole house renovation

What a Shop Fit-Out Covers

From the street to the stockroom.

Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 3 options.

Steel beams carrying the opening into a new extension during construction

Shopfront and Signage

The first thing customers see Read more Close

New or refurbished shopfronts, glazing, entrance doors and signage. A new shopfront normally needs planning permission, and illuminated signs usually need advertisement consent, so both are applied for early.

Ground floor being opened up into one open plan space

Shop Floor

Layout, lighting and display Read more Close

Flooring, ceilings and lighting designed around the products, with counters, display units and changing rooms built or installed to your layout.

First fix electrics and plumbing exposed during a house renovation

Back of House

Stock, staff and services Read more Close

Stockrooms, staff areas, toilets including accessible facilities where required, and the electrics, heating, cooling and security systems that run the shop.

What Our Customers Say on Google

Every review below comes straight from our Google Business Profile, in the customer's own words.

Posted on Google Google
Stacy profile picture
Stacy
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
It is always hard to find a reliable and trust worthy tradesman! you hear so many stories about cowboy builders and it puts you off getting work done. Sami was recommended to me by a friend who he had worked for before. I am so glad that I was put in touch with him! the work was completed within the time frame, under the budget and more importantly to an exceptional standard!
Posted on Google Google
Eric Fox’s profile picture
Eric Fox’s
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Sam and his team built our loft extension to a high standard. They involved the building inspectors at every step of the way, and creatively found solutions to unexpected problems. They are very skilled, and worked with great professionalism - arriving on time every day, and keeping the lines of communication clear.
Posted on Google Google
clive stewart profile picture
clive stewart
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Right choice builders did an excellent job on my kitchen renovation they were very approachable and kept me informed at every stage 👍
Posted on Google Google
Mei Wong profile picture
Mei Wong
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We recently had our loft converted and home renovated by Right Choice Builders, and we’re extremely happy with the results. The team was reliable, efficient, and completed the work to a high standard. Communication was clear throughout, and they kept everything tidy and on schedule. The finished space looks fantastic – solid workmanship and great attention to detail. Highly recommend for anyone looking for a trustworthy and skilled building team.
Posted on Google Google
Mariam Layla Yahya profile picture
Mariam Layla Yahya
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
So happy with the renovation work done by Sami. New kitchen, bathroom, and the knocked through walls have completely transformed the space. He was friendly, reliable, and really paid attention to detail. It honestly feels like a brand new home, deffo five stars!

Approvals for the Shopfront and the Shell

Planning drawings and project paperwork laid out on a desk

Changes to a shopfront affect the street, so they normally need planning permission, and in a conservation area councils often have detailed shopfront design guidance. Illuminated signage usually needs advertisement consent, and external security shutters are often controlled too. Inside, the landlord’s consent is needed through a licence for alterations, and the fit-out must meet the building regulations for fire escape, accessibility and new services.

We apply for each approval at the start of the programme, because they are what most often delay an opening.

A Programme That Works Back From Opening Day

Roof joists and first-floor structure of a large house extension under scaffolding

The programme is built backwards from the opening date: stock delivery, fixtures, the shopfront glazing and shutters, which often have the longest lead times, then the services and the building work. Where the unit is in a parade or a shopping centre, deliveries and noisy work are agreed with the landlord and neighbours.

At handover the shop is cleaned and the systems commissioned, with the certificates and the information needed for the fire risk assessment and the insurers.

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

Ground floor being opened up into one open plan space

Send us the unit and your brand guidelines

The address, a floor plan and your opening date are enough to start. We reply with a written price and book your free site survey within 24 hours.

Get your fit-out price

Or call 07551 003647, every day 9am to 5pm.

Your Shop Fit-Out Quote

Priced by area and by trade, with the shopfront and fixtures shown separately.

The total is shown with and without VAT, with long lead items and specialist packages clearly labelled.

Ground floor stripped to the joists during a whole house renovation
The sections of your quote
  • Planning and advertisement consent
  • Strip-out
  • Shopfront, glazing and shutters
  • Floors, walls and ceilings
  • Lighting and electrics
  • Counters, display and changing rooms
  • Toilets, stockroom and staff areas
  • Heating, cooling and ventilation
  • Fire safety, commissioning and handover
What moves the price

The shopfront, the specification of fixtures and display, the lighting design and the heating and cooling. Each is its own section.

Your Shop Fit-Out, Step by Step

  1. Survey and Brief

    Within 24 hours of your call we survey the unit and take your brief, brand guidelines and opening date.

  2. Design and Approvals

    The layout is agreed and the planning, advertisement and landlord consents applied for.

  3. Ordering Long Lead Items

    Shopfront glazing, shutters, fixtures and equipment are ordered against the programme.

  4. Fit-Out

    Building work, services and the shopfront are completed, then fixtures and display installed.

  5. Commissioning and Handover

    Systems are commissioned, the shop is cleaned and handed over ready to stock.

Ground floor being opened up into one open plan space

See Our Commercial Work

For examples of our finishing standard, see our projects page, or read about all our commercial services.

Our rating stands at 5 stars on Google and 9.71 out of 10 on Checkatrade.
  • 5 stars on Google
  • 9.71 out of 10 on Checkatrade

Questions About Shop Fit-Outs

Do I need planning permission for a new shopfront?

Usually, yes, because it changes the appearance of the building. In conservation areas councils often have specific shopfront design guidance. Illuminated signs usually need advertisement consent as well.

Can a shop become a café or office without planning?

Shops, cafés, restaurants and offices are all in the same commercial use class, so moving between them usually does not need planning permission, though building work and signage may. Takeaways and bars are in different classes.

How long does a shop fit-out take?

It depends on the size of the unit and the shopfront. The programme is agreed in writing, working back from your opening date, with approvals and long lead items started first.

Do I need my landlord's consent?

For most alterations to a leased unit, yes, through a licence for alterations. Shopping centres also have their own fit-out rules.

Do I need accessible facilities?

New work must meet the building regulations for access, and the Equality Act requires reasonable adjustments for disabled customers and staff. We design entrances, counters and toilets accordingly.

Can you work at night?

Where the unit is in a busy centre or next to trading neighbours, noisy work can be scheduled out of hours by agreement with the landlord.

Book Your Free Site Survey

Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

Or call 07551 003647
Completed home extension exterior built by Right Choice Builders

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    Open on Time, Looking Right

    A shop fit-out is a race to an opening date that rarely moves. The survey identifies the approvals and long lead items on day one, so they are not what holds the doors shut.

    Tell us about the unit and your opening date, and the survey is booked within 24 hours.