Planning Permission and Building Regulations Support
Planning permission and building regulations handled for you: we find the right planning route for your project, prepare and submit the drawings, and take the building regulations approval through to the completion certificate.…
Planning and building regulations are two separate systems, and most home projects need to satisfy both. Planning decides whether you can build something at all; building regulations decide how it must be built. Getting the order and the route right at the start saves months.
It starts with a site survey within 24 hours of your call, where we check the planning history of the address, any conservation area or Article 4 direction, and what your project needs.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
Approvals Handled by the Team That Will Build It
We prepare the planning drawings and the application, the building regulations drawings and the structural engineer’s calculations, and we serve the party wall notices and apply for a build over agreement from the sewerage company, Thames Water across most of London and Surrey, where a public sewer is near the work.
Because the same team builds the project, the drawings are prepared with construction in mind, so the approved design is one that can be built as drawn and priced accurately. We deal with the planning officer and the building inspector on your behalf from submission to sign-off.

Which Approval Does Your Project Need?
The survey settles which route applies to your address. These are the four most common for homes.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 4 options.
Permitted Development
No planning application needed
Read more
Close
Many single-storey rear extensions, loft dormers and garden buildings can be built under permitted development, within limits on size, height and position. A lawful development certificate from the council confirms the project is lawful, which is worth having when you sell or remortgage.
Prior Approval
Larger single-storey extensions
Read more
Close
A single-storey rear extension of up to 6 metres on a terraced or semi-detached house, or 8 metres on a detached house, can be built through the prior approval process. The neighbours are notified, and the council decides within 42 days whether the effect on them is acceptable.
Householder Planning Application
Double storey, side and larger schemes
Read more
Close
Projects beyond permitted development, such as double storey and side extensions, mansard roofs and most work in conservation areas, need a householder planning application. The council aims to decide within 8 weeks of the application being validated.
Building Regulations Approval
Needed for almost every project
Read more
Close
Separate from planning, building regulations cover structure, fire safety, insulation, ventilation, drainage and electrics. Almost every extension, loft conversion and structural alteration needs approval and inspections, ending with a completion certificate.
What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
Choosing the Right Planning Route

The route depends on the house, the address and the design. A terraced house and a detached house have different permitted development limits; a conservation area, an Article 4 direction or a listed building removes some rights altogether; and previous extensions count against what is left.
Where a project is close to the limits, it can be worth designing it slightly smaller to stay within permitted development, or applying for a lawful development certificate before building. Where an application is needed, a pre-application enquiry with the council can test a design before the full drawings are paid for. We set out the options and their timescales so you can choose.
Building Regulations: Full Plans or Building Notice

With a full plans application, detailed drawings and the engineer’s calculations are checked and approved before work starts, and the council must decide within five weeks, or two months if you agree an extension. With a building notice, work can start sooner but nothing is approved in advance, so problems are found on site. For anything structural we recommend full plans.
Building control can be provided by the council or by a registered building control approver. Either way, the inspector visits at key stages, foundations, drainage, structure, insulation, and issues the completion certificate at the end, which your solicitor will ask for when you sell.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
From First Question to Completion Certificate
-
Survey and Planning Check
We survey the property and check the planning history, conservation area status, Article 4 directions and any restrictions on the title or the land.
-
Design and Drawings
Planning drawings are prepared for the route that applies, with a pre-application enquiry first where the design needs testing with the council.
-
Submission and Decision
We submit the application and deal with the planning officer's questions. Householder decisions are due within 8 weeks of validation; prior approvals within 42 days.
-
Building Regulations and Notices
The building regulations drawings and engineer's calculations are approved, party wall notices served and any build over agreement applied for.
-
Inspections and Completion Certificate
Building control inspects the work at each stage, and the completion certificate is issued when the work is finished and signed off.
Watch Our Projects on YouTube
Finished projects filmed on site by our own team. Each video opens on our YouTube channel, where you can see the rest.
-
Video
South Croydon full renovation, before and after
(opens on YouTube in a new tab)
-
Video
House extension and garden outhouse in Wimbledon
(opens on YouTube in a new tab)
-
Video
Completed kitchen in Catford
(opens on YouTube in a new tab)
-
Video
Completed works in Surbiton
(opens on YouTube in a new tab)
Questions About Planning and Building Regulations
How long does planning permission take?
The council aims to decide a householder application within 8 weeks of validating it. A prior approval for a larger single-storey extension is decided within 42 days. Allow time before that for the survey and drawings, and for validation, which can take a week or two.
What happens if planning is refused?
The refusal notice gives the reasons. Often the design can be amended and resubmitted to address them; otherwise a householder appeal can be made to the Planning Inspectorate within 12 weeks of the decision. We advise on which is more likely to succeed.
Do I need building regulations approval if I do not need planning?
Usually yes. Permitted development only removes the need for planning permission. An extension, a loft conversion or the removal of a structural wall still needs building regulations approval and inspections.
Full plans or building notice?
For structural work we recommend full plans, because the design is checked and approved before building starts. A building notice can suit small, simple jobs, but any problem is found on site, where it costs more to fix.
Is a lawful development certificate worth getting?
If your project is built under permitted development, a certificate is formal proof that it was lawful, which buyers’ solicitors and lenders often ask for. It is also a safe way to confirm a borderline design before building it.
Do I need to tell my neighbours?
For a planning application or prior approval the council notifies them. Separately, the Party Wall Act requires notices for work on a shared wall or for digging close to a neighbour’s foundations, which we serve as part of the project.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
The Right Route, Chosen Before the First Drawing
A design that fits the planning route from the start is quicker to approve and cheaper to build. The survey checks the address before anything is drawn, so the first application is the right one.