Skip to content
Family-run for 28 yearsCheckatrade 9.71 out of 10 (opens in a new tab)FMB memberGas Safe registered
07551 003647 Open nowEvery day, 9am to 5pm
07551 003647 Open nowEvery day, 9am to 5pm Get a price

South London House Extensions, Designed to Be Lived In

Picture the galley kitchen at the back of a Victorian terrace, the side passage full of bins, and the garden you can only see through one small window…

A house extension by Right Choice Builders turns that into one room the width of the house, built by our own trades to a structural engineer's design, inspected by building control at each stage, and priced in nine itemised sections from your drawings, with a promise on single-storey extensions: the shell up within 6 weeks of the first day on site, or £1,000 back for every week we are over, up to £3,000.

Every extension starts with a site survey within 24 hours of your call that checks the ground, the drains and the trees before anything is drawn, because those three decide more of the price than the kitchen does.

Book a Survey Within 24 Hours

Free and without obligation, anywhere across South London.

Single-storey shell up in 6 weeks or £1,000 back a week. FMB inspected member. Call 07551 003647.

Brick rear house extension with bifold doors built in South London

House Extensions Designed, Built and Signed Off by One Team

Right Choice Builders builds house extensions across South London, from Peckham and Lewisham to Croydon, Wimbledon and Sutton: single-storey rear and side return extensions, wraparounds, double-storey builds and kitchen extensions on Victorian terraces, interwar semis and detached houses.

Every extension is designed to a structural engineer's calculations, built by our own Gas Safe and NAPIT registered trades in 9 to 24 weeks on site depending on the type, and handed over with its completion certificate, a 12-month workmanship warranty and a 10-year guarantee on the structural work.

House extension construction drawing A plan drawing of a terraced house with a new rear extension running the full width of the house, showing the steel over the old rear wall, the side return, an existing manhole and a 3-metre projection. Steel over old wallNew extensionSide returnManhole3.0 m 04DETAIL House Extensions RCB-A004NTS · REV A

The Extension That Fits Your Plot, Not Just Your Wish List

The shape of your plot and the position of your neighbours decide which extension makes sense, which is why the site visit walks the boundary before it looks at kitchen brochures.

Most single-storey rear extensions need no planning application at all, while a wraparound or a double storey almost always does. The survey tells you which route your plot takes before any drawing is paid for.

Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all five extension types.

Completed rear house extension with wide bifold doors onto the garden

Rear Extension

More living space across the full width Read more Close

A rear extension runs the full width of the back of the house out into the garden, and on a terrace or semi it can go 3 metres beyond the original rear wall under permitted development, or 4 metres on a detached house, with no planning application. It gives the kitchen diner most families are after and it is the quickest of the five to build, because the structure is one steel over the old rear wall and a new roof.

Rear house extension brickwork under construction in South London

Side Return

The passage that becomes a kitchen Read more Close

Victorian and Edwardian terraces across Peckham, Lewisham and Catford have a narrow strip of dead ground beside the rear addition, and a side return extension roofs it over to widen the kitchen by a metre and a half or more without touching the garden. The party wall sits on the boundary, so notices to the neighbour and a careful roof detail against their wall are part of the job from the first drawing.

Wraparound house extension with a roof lantern and bifold doors

Wraparound

Rear and side together for the widest room Read more Close

A wraparound combines the rear and side return in one L-shaped structure, which is how a terraced house ends up with a kitchen, dining and living space across the whole width and depth of the ground floor. It normally needs a planning application, since the combined footprint goes beyond what permitted development allows, and the steelwork runs in two directions, so the engineer's design matters more here than on any other type.

Upper floor extension under construction behind full scaffolding

Double Storey

A bedroom above and a kitchen below Read more Close

A double-storey extension adds a bedroom or bathroom over the new ground floor room, sharing one set of foundations and one roof, which is why it costs less per square metre than building the two floors separately. It needs planning permission, the foundations go deeper, and on a semi the upstairs windows are placed to avoid overlooking the neighbour.

Open-plan kitchen extension with herringbone flooring and an island

Kitchen Extension

Built around the kitchen you choose Read more Close

Most rear and side return extensions in South London are kitchen extensions, so the floor level, the drainage runs, the electrical points and the position of the bifold doors are all set around the kitchen layout before the slab goes in. The kitchen itself is usually your supply, and the kitchen fit-out is done by our own plumbers and electricians so the certificates arrive with the finished room. A downstairs WC or utility room is often built into the same footprint, since the drainage and the plumbing are already being run, and it appears as its own lines on the quote.

Structural steel installed over the old rear wall of a house extension

Your Extension Shell Up in 6 Weeks

The shell of your single-storey extension is up within 6 weeks of the first day on site, or we credit £1,000 against your final invoice for every full week we run over, up to £3,000 in total.

  • 6 weeks to a watertight shell
  • £1,000 a week over, up to £3,000
  • Single-storey extensions

Want this promise on your quote?

Book your free site survey

What Our Customers Say on Google

Every review below comes straight from our Google Business Profile, in the customer's own words.

Posted on Google Google
Stacy profile picture
Stacy
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
It is always hard to find a reliable and trust worthy tradesman! you hear so many stories about cowboy builders and it puts you off getting work done. Sami was recommended to me by a friend who he had worked for before. I am so glad that I was put in touch with him! the work was completed within the time frame, under the budget and more importantly to an exceptional standard!
Posted on Google Google
Eric Fox’s profile picture
Eric Fox’s
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Sam and his team built our loft extension to a high standard. They involved the building inspectors at every step of the way, and creatively found solutions to unexpected problems. They are very skilled, and worked with great professionalism - arriving on time every day, and keeping the lines of communication clear.
Posted on Google Google
clive stewart profile picture
clive stewart
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Right choice builders did an excellent job on my kitchen renovation they were very approachable and kept me informed at every stage 👍
Posted on Google Google
Mei Wong profile picture
Mei Wong
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We recently had our loft converted and home renovated by Right Choice Builders, and we’re extremely happy with the results. The team was reliable, efficient, and completed the work to a high standard. Communication was clear throughout, and they kept everything tidy and on schedule. The finished space looks fantastic – solid workmanship and great attention to detail. Highly recommend for anyone looking for a trustworthy and skilled building team.
Posted on Google Google
Mariam Layla Yahya profile picture
Mariam Layla Yahya
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
So happy with the renovation work done by Sami. New kitchen, bathroom, and the knocked through walls have completely transformed the space. He was friendly, reliable, and really paid attention to detail. It honestly feels like a brand new home, deffo five stars!
Rear extension foundations and drainage being installed in South London

Why Foundations and Drains Shape the Project First

The first thing an extension has to pass is not planning but the ground, because South London sits on clay that shrinks and swells with the seasons, and mature trees make it move further.

Two identical houses on one street can carry different foundation costs for that reason alone.

The site visit digs a trial hole where the new wall will stand and looks at every tree within reach of it, because the footing depth the engineer specifies decides a large part of the price before a brick is priced.

Free site survey, no obligation Book a survey

Four things the survey settles about the ground, in the order they change the price

Read the four checks
  1. The trial hole

    A hole is dug where the new wall will stand, so the engineer specifies the footing depth from what is actually under your garden rather than from an assumption.

  2. Every tree within reach

    Mature trees near the new footing make clay move further, so each one within reach of the wall is noted at the survey and carried into the engineer's design.

  3. The sewer under the garden

    Since 2011 most of the pipes running through South London rear gardens have been public sewers owned by Thames Water, and around half of them are not on any map.

  4. The build over agreement

    Building over a public sewer, or within 3 metres of one, needs a build over agreement from Thames Water before building control will sign the extension off.

Where the manhole sits

We locate the pipe at the survey, lift the manhole to see which way it runs, and price the answer, which is either a sealed double-seal cover so the manhole is built over, or a short diversion. The existing manhole usually sits exactly where the kitchen wants to go.

Why finding it early matters

Found early, the self-declaration route takes about 2 weeks. Found late, a full application with a CCTV survey takes 6 to 8 weeks that the programme cannot absorb, which is why the drains are checked before anything is drawn.

How the Opening Is Held Up and the New Room Kept Warm

Steel on padstones New opening, full width Opening width sets the steel size Pier

When the old rear wall comes out, a steel beam on padstones carries everything above it, and the wider the opening the bigger the steel and the padstones become.

Where the return wall comes out as well, the engineer designs a goalpost frame, two posts and a beam, so the corner of the house has something to stand on. Building control checks those calculations before the steel arrives, and our own team fits it, which is why the opening is propped and finished in days, not left on acrows while a subcontractor is chased.

The structural work carries a 10-year guarantee.

The new room then has to meet Approved Document L for an extension, and every part of that answers to a named authority.

All four are closed. Open any of them to read the requirements in full.

Approved Document L

5 requirementsHeat loss. The insulation and glazing standards the new room has to meet.
Walls and floors
Insulated to a U-value of 0.18 W/m²K.
The roof
Insulated to a U-value of 0.15 W/m²K.
Doors and windows
Fitted to a U-value of 1.4 W/m²K.
Glazed area
Normally kept within a quarter of the extension's floor area, so the whole house does not need a SAP calculation.
What that means on site
90 millimetres of rigid insulation in the cavity, cavity trays and weep vents above the openings, and a ventilated roof insulated to the current standard.

FENSA

1 requirementGlazing. Who certifies the bifold or sliding doors once they are fitted.
Bifold and sliding doors
Carry a FENSA certificate when they are fitted.

NAPIT

1 requirementElectrical. Who certifies the electrical work in the new room.
Electrical work
Certified by our own registered electricians.

Gas Safe Register

1 requirementGas. Who certifies the boiler and the heating in the new room.
Boiler, heating and gas work
Done and certified by our own engineers.

The floor is decided before any of that, because the new slab has to finish level with the existing kitchen floor once the insulation and any underfloor heating are in, and getting that wrong is the mistake you live with.

Because every one of those sits with a named body, the gas certificate, the electrical certificate and the completion certificate arrive together at the end rather than trickling in for months afterwards.

Steel beams installed over a rear wall opening by Right Choice Builders

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

Completed rear extension with wide bifold doors onto the garden

Send a photo of the back of your house

Snap the rear wall, the side return or your plans. We reply with a written price and book your free site survey within 24 hours.

Get your extension price

Or call 07551 003647, every day 9am to 5pm.

Permitted Development, Prior Approval or Full Planning?

Most single-storey rear extensions on South London houses need no planning application.

Permitted development allows 3 metres beyond the original rear wall on a terrace or semi and 4 metres on a detached house, provided the extension stays inside the height limits and covers no more than half the garden.

3m Terraced or semi-detached house allowance
4m Detached house allowance
Three sections

What permitted development allows

Six rules
  • 3 metres beyond the original rear wall on a terrace or semi
  • 4 metres beyond the original rear wall on a detached house
  • No more than 4 metres high overall
  • No more than 3 metres high within 2 metres of a boundary
  • No more than half the garden built over
  • A side extension of up to half the width of the original house

Going further needs prior approval

Two house types

Larger single-storey extensions go through the prior approval route for £249. The council writes to your neighbours, who have 21 days to object, and must decide within 42 days or the scheme counts as approved.

Terraced or semi-detached house 3m to 6m
Detached house 4m to 8m

The orange band is the extra depth the prior approval route can add, from 3 metres to 6 on a terrace or semi and from 4 metres to 8 on a detached house. Both scales run from 0 to 10 metres, and the ticks mark every 2.

If you do need an application

£274 or £548

Lawful development certificate

£274 Proposed work

A lawful development certificate puts the council's confirmation in writing and is what a buyer's solicitor will ask for when you sell.

Full householder application

£548 Application fee

Wraparounds and double-storey extensions need a full householder application, which councils aim to decide within 8 weeks.

So does anything in a conservation area or under an Article 4 direction, which cover parts of Southwark and Lewisham, since each council draws those boundaries differently.

Your Extension Quote, Itemised From Foundations to Finishes

The quote follows the survey and your drawings and runs to nine sections that follow the build in order.

Each section lists the materials and the work, the total is stated including VAT so nothing is added afterwards.

Rear extension groundwork and blockwork underway in South London
The nine sections of your quote
  • Site preparation and excavation
  • Foundations, piers and pads
  • Steel bearing plates and beams
  • Walls and structure
  • The roof, ventilators and rooflights
  • Windows and doors
  • Internal works, first fix to decoration
  • Drainage and surface water
  • Compliance and certification
What moves the price

What moves the price is the ground first, then the width of the opening and the size of the steel, then the glazing you choose, then whether the roof is flat, lean-to or a lantern, and finally the kitchen and finishes you supply.

Each of those is its own line, so you can see which one is doing the work.

What is included and excluded

The foundations section carries the engineering brick piers, sleeper walls and pad foundations the engineer specifies, and the walls section carries the cavity insulation, the cavity trays and the weep vents.

The exclusions section names what the figure leaves out, normally the kitchen units, the flooring and the second fix items you prefer to choose, so a single-figure quote from elsewhere can be set against it line by line.

Where the new room includes a downstairs WC or utility, the kitchen and bathroom fit-out appears as its own lines on the same document.

Your Extension, From Site Visit to Final Sign-Off

  1. A Survey Within 24 Hours, With a Spade, Not Just a Tape

    Within 24 hours of your call we measure the plot, dig the trial hole, lift the manhole, note the trees and the party walls, and tell you which extension your plot will take and what the ground will cost.

  2. Drawings, Calculations and the Sewer Check

    Planning and Building Regulations drawings, the structural engineer's calculations and the Thames Water sewer search are produced under one contract, or priced from drawings you already hold.

  3. Permissions, Notices and the Build Over Agreement

    The right planning route is submitted, the party wall notices go out, one month ahead for excavation deeper than a neighbour's foundations and two months for work to a shared wall, and the build over agreement is applied for where a public sewer is within 3 metres.

  4. Your Itemised Quote, Nine Sections, VAT Included

    The quote follows the survey and the drawings, with the programme agreed in writing before the skip is ordered.

  5. Construction, Inspections and Final Certification

    The shell goes up first and the fit-out follows, over 9 to 24 weeks on site depending on size and type, building control inspects the footings, the steel, the drainage and the insulation as they go in, and you receive the completion certificate, the FENSA, gas and electrical certificates, a 12-month workmanship warranty and the 10-year structural guarantee.

Keeping a Kitchen Working While the Back Comes Off

Most customers stay in the house, and the question that matters most is how long you are without a kitchen, so the programme is built around it. The foundations, walls and roof go up outside the existing rear wall first, and the old kitchen keeps working until the new structure is watertight.

While the shell goes up

The old kitchen keeps working, because the new room is built outside it.

Once the rear wall comes out

A temporary kitchen is set up in another room with the cooker, fridge and a sink.

Read more about living in the house during the build

Because the shell goes up first, the point at which the wall comes out arrives early, so the stretch without a fitted kitchen is as short as the programme allows.

On a mid-terrace with no side access, the spoil from the footings goes out through the house and the materials come in the same way, so the hallway is boarded and sheeted before the first dig, and the grab lorry and skip are booked to keep that traffic to a few days rather than weeks.

The kitchen you are supplying has to be ordered early enough that its lead time does not hold up the second fix, so the order date is agreed with you at the start, not discovered in week ten.

Your project manager gives you one number to ring, the same trades return each day until their part is finished, and the house is closed up and secured each evening.

Rear extension with bifold doors and rooflights built in South London

See Our Completed House Extensions Across South London

Our portfolio shows a completed kitchen extension with bifold doors opening the full width onto the garden, an island under pendant lights and full-height units, alongside a house extension in Mitcham, an extension and outhouse in Mitcham and a new kitchen in Catford. Customers on Checkatrade and Bark describe a double-storey side extension with a 6-metre rear, a kitchen extension with a cloakroom and dining room, and a team that turned up every day and finished within the agreed time and budget.

“Sam and his team did an amazing job building my kitchen extension.”

Checkatrade review
Those reviews name Sami, who leads the team on site, and our rating stands at 5 stars on Google and 9.71 out of 10 on Checkatrade.
  • 5 stars on Google
  • 9.71 out of 10 on Checkatrade

Questions Homeowners Ask Before Extending

How Far Can I Extend Without Planning Permission?

Three metres beyond the original rear wall on a terraced or semi-detached house and 4 metres on a detached one, at single storey and within the height and garden limits, with 6 and 8 metres available under prior approval. Conservation areas, Article 4 directions, flats and listed buildings need a full application.

Do I Need a Build Over Agreement From Thames Water?

Yes, if any part of the extension sits over or within 3 metres of a public sewer, or within 1 metre of a public lateral drain, and in South London rear gardens that is common because the 2011 transfer made most shared pipes public. The survey locates the pipe and the agreement is applied for before the build starts.

How Long Does a House Extension Take?

Between 9 and 24 weeks on site: about 12 to 16 weeks for a single-storey rear extension, with the shell up in the first 6 weeks or £1,000 back for every week over, and longer for a wraparound or double storey, with the programme agreed in writing with the quote. Drawing and permission time comes before that, which is why the survey happens first.

What Counts as the Shell in the 6-Week Promise?

Foundations, walls, steels and roof structure complete, the roof covered and watertight, and the external doors and windows fitted, so the new room exists and the old kitchen can come out. The promise applies to single-storey extensions.

Do I Need a Party Wall Agreement for an Extension?

On a terrace or semi, almost always, because a side return builds against the shared wall and any footing dug within 3 metres of a neighbour's building and deeper than its foundations needs an excavation notice. Notices are served one month ahead for excavation and two months for work to the wall itself, and where the neighbour does not consent a surveyor draws up the award.

Can I Combine an Extension With a Loft Conversion?

Yes, and doing both under one programme shares the scaffold, the skips and the disruption. The loft conversion is designed alongside the extension so the structure and the fire strategy work together, and the whole job is priced as one quote.

Who Supplies the Kitchen?

Normally you do, and it is listed as an exclusion on the quote so you can choose it, with the fit-out done by our own plumbers and electricians. The order date is agreed at the start so the kitchen's lead time never holds the programme.

Can a Neighbour Stop My Extension?

No. A neighbour can comment during the council's consultation, but only the council decides, and only on material considerations such as loss of daylight, overlooking or an overbearing effect, tested against guides like the 45 degree rule; personal dislike and property value carry no weight, and around nine in ten householder applications are approved. Under permitted development neighbours are not consulted at all, and under prior approval they have 21 days to comment on amenity only. The party wall notices are a separate process, and we serve those whichever route applies.

Bifold or Sliding Doors?

Sliding doors give more glass for the same opening, because bifold frames take up width when folded, while bifolds open the whole wall in summer. Both are fitted to a U-value of 1.4 and certified under FENSA, and both count towards the glazed area that Part L caps at a quarter of the extension's floor area, which is why the choice is made at the design stage and not at the showroom.

Do I Need to Tell My Home Insurer?

Yes, before work starts, because most buildings policies require notice of structural work and some suspend cover while the rear wall is out. Our £5m public liability insurance covers our work and our team on your site; your own policy covers the house and its contents, so the two need to sit side by side.

Is there something else you would like to ask?

Ask Our Team

Book Your Free Site Survey

Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

Or call 07551 003647
Completed home extension exterior built by Right Choice Builders

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    Build Today's Foundations for What Comes Next

    One decision at the start pays off years later: where a second storey or a loft might follow, the foundations for a single-storey extension can be dug to double storey depth now for a fraction of what it costs to underpin them later. The site visit asks what you might want in five years as well as what you want now, and the engineer designs to it.

    Tell us the house, the plot and what you want the back of it to do, and the survey is booked within 24 hours.

    07551 003647
    Book Your Survey Free, no obligation, and the advice is yours to keep.