Double-Storey Extensions in London and Surrey
A double-storey extension adds space on two floors for the cost of one set of foundations and one roof: a bigger kitchen or living room below, and a bedroom, bathroom or study directly above.…
Right Choice Builders designs and builds double-storey extensions from the first survey to the completion certificate: the planning drawings, the structural engineer’s calculations, the party wall notices and the build itself, all by one team and priced on one itemised quote.
A survey is booked within 24 hours of your call. It checks the ground, the drains, the trees and the distance to your boundaries, because on a two-storey build those four decide what the council will allow and what the foundations will cost.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
Two Floors Added in One Build, Under One Contract
A double-storey extension, also called a two-storey extension, builds a new ground floor room and a new first floor room on the same footprint, so the foundations, the walls and the roof are shared. That is why it costs noticeably less per square metre than building a single-storey extension now and adding a floor later.
We build double-storey rear, side and wraparound extensions across London and Surrey, from semi-detached houses in Wimbledon, Surbiton and Purley to detached homes in Esher, Cobham, Banstead and Reigate, with our own trades, a structural engineer’s design and building control inspections at every stage.

Which Double-Storey Extension Suits Your House
The position of your house on its plot, and how close it sits to the neighbours, decides which shape of double-storey extension the council is likely to approve. The survey walks the boundaries first, so you know the realistic options before anything is drawn.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 4 options.
Double-Storey Rear
A bigger kitchen below, a bedroom above
Read more
Close
The most common double-storey extension: both floors extend out into the garden across part or all of the back of the house. A modest rear extension can sometimes be built under permitted development, but only up to 3 metres deep, at least 7 metres from the rear boundary and outside a conservation area, so most of the double-storey rear extensions we build go through a householder planning application.
Double-Storey Side
Using the space beside a semi or detached house
Read more
Close
On a semi-detached or detached house, the strip beside the house, often a driveway or an old garage, can become a utility room or study downstairs and a fourth bedroom above. A two-storey side extension always needs planning permission, and councils normally ask for it to be set back from the front wall and set down from the main ridge so it reads as an addition, which the design allows for from the start.
Two-Storey Wraparound
Side and rear together for the most space
Read more
Close
A wraparound combines the side and rear in one L-shaped structure on two floors, giving the largest gain in floor area of any extension short of rebuilding. The steelwork runs in two directions and the new roof has to meet the old one on two sides, so the structural design and the roof detail carry more of the cost here than on any other shape.
Over an Existing Extension
A new floor on top of a single-storey room or garage
Read more
Close
Where there is already a single-storey extension or an attached garage, a first floor can sometimes be built on top of it. It depends entirely on what is underneath: a trial hole shows how deep the existing foundations go, and the engineer confirms whether they and the walls can carry a second storey or need strengthening first.
What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
Planning Permission for a Double-Storey Extension

Permitted development allows a two-storey rear extension only within tight limits: no more than 3 metres beyond the original rear wall, at least 7 metres from the rear boundary, a roof pitch matching the house, materials that match, and any upstairs side windows obscure glazed and fixed below 1.7 metres. It does not apply in a conservation area, and a double-storey side extension is never permitted development.
In practice that means most double-storey extensions need a householder planning application. Councils decide them within 8 weeks, and judge them mainly on light and outlook for the neighbours, usually tested with the 45 degree rule, and on how the extension sits against the original house.
Much of Kensington and Chelsea, and many streets in Richmond, Elmbridge and Wimbledon, lie in conservation areas, where the design is assessed more closely and the materials have to match the street. In those areas we recommend a pre-application enquiry with the council before full drawings are paid for.
Foundations and Structure Designed for Two Floors

A second storey roughly doubles the load on the foundations, so they are designed by a structural engineer from what the survey finds in the ground. On London clay near trees, the foundations go deeper to stay below the roots, and the trial hole settles the depth before the quote is written rather than after the digger arrives.
Where the extension opens into the house on both floors, steel beams carry the walls above each opening, and the new first floor is tied into the existing structure so the two move as one. The new roof is built to meet the main roof cleanly, which is where most of the design time on a double-storey extension goes.
The structural work carries a 10-year guarantee.
Building Regulations for the New Upstairs Room

A new first floor bedroom brings fire safety into the design. Each new habitable room upstairs needs either an escape window, big enough and low enough to climb out of, or a protected route down the stairs, and the house gets mains-wired, interlinked smoke alarms.
The walls and floor are insulated to a U-value of 0.18 W/m²K, the roof to 0.15 W/m²K and the windows and doors to 1.4 W/m²K, with glazing kept within the quarter-of-floor-area limit unless the design proves the heat loss another way. An upstairs bathroom needs its soil pipe, ventilation and drainage planned before the walls go up.
Building control inspects the foundations, the drains, the structure and the insulation as the work goes on, our NAPIT registered electricians certify the electrics, and you receive the completion certificate at handover.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
How Much Does a Double-Storey Extension Cost?
A double-storey rear extension of about 40 m² over two floors typically costs £110,000 to £160,000 including VAT, with 16 to 24 weeks on site. At £2,600 to £3,500 per square metre it is the lowest cost per square metre of any extension, because one set of foundations and one roof serve both floors.
| Type | Typical size | Guide price (inc VAT) | Time on site |
|---|---|---|---|
| Double-storey rear extension | 40 m² over two floors, £2,600 – £3,500 per m² | £110,000 – £160,000 | 16–24 weeks |
| Single-storey rear extension | 20–30 m², £3,000 – £4,000 per m² | £65,000 – £110,000 | 12–16 weeks |
| Wraparound extension | 30–40 m², £3,200 – £4,000 per m² | £100,000 – £150,000 | 14–20 weeks |
Kitchens, bi-fold or sliding doors above the standard specification, and underfloor heating are priced separately.
Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.
Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.
Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.

Send a photo of the side or back of your house
Show us where the extension would go, or send the drawings you already have. We reply with a written price and book your free site survey within 24 hours.
Get your extension priceOr call 07551 003647, every day 9am to 5pm.
Your Double-Storey Extension Quote, Itemised
The quote follows the survey and the drawings, and lists the build section by section in the order it happens.
Each section shows the materials and the work, and the total includes VAT, so a single-figure quote from elsewhere can be compared with it line by line.

The sections of your quote
- Site set-up, scaffolding and protection
- Excavation and foundations
- Drainage and the sewer connection
- Ground floor walls, steels and floor
- First floor structure and walls
- Roof structure, covering and the tie-in to the main roof
- Windows, doors and rooflights
- Opening into the house on both floors
- Electrics, heating and plumbing
- Plastering, joinery and decoration
- Building control, certificates and completion
What moves the price
The ground first: the depth of the foundations and any trees or drains in the way. Then the shape, because a wraparound or a side extension set down from the ridge needs a more complex roof. Then the openings into the house on each floor, the glazing you choose, and whether an upstairs bathroom is included.
Each of those is its own line on the quote, so you can see which one is doing the work. The price guide above shows where most double-storey extensions land.
What is included and excluded
The quote includes the drawings and calculations if we produce them, the structure, the roof, the windows and doors, first fix and second fix electrics and plumbing, plastering and decoration. The exclusions section names what the figure leaves out, normally the kitchen units, bathroom fittings and floor finishes you prefer to choose yourself.
Your Double-Storey Extension, From Survey to Sign-Off
-
A Survey Within 24 Hours of Your Call
We measure the house and plot, check the distances to every boundary, lift the manholes, note the trees and the neighbours' windows, and tell you which shape of extension the council is likely to allow.
-
Drawings, Engineer's Calculations and the Planning Route
Planning drawings, building regulations drawings and the structural engineer's calculations are produced under one contract, or we price from drawings you already have.
-
Planning Permission and Party Wall Notices
The householder application goes in and the council decides within 8 weeks. Party wall notices are served at least one month ahead for digging deeper than a neighbour's foundations and two months for work to a shared wall.
-
Your Itemised Quote and the Programme
You receive the quote section by section with VAT included, and the programme in writing, so you know which weeks the house will be busiest before you sign.
-
The Build, Inspected at Every Stage
Foundations, ground floor, first floor and roof go up outside the house first; the openings are made once the new structure is watertight. Building control inspects as we go, and you receive the completion certificate, a 12-month workmanship warranty and the 10-year structural guarantee.
Staying at Home While the Extension Goes Up
Most families stay in the house throughout. The new structure is built outside the existing walls, so day-to-day life carries on until the openings are made, and that moment is planned to the day.
While the new structure goes up
The house works as normal, because the extension is built against the outside walls.
When the openings are made
The rooms affected are sealed with dust screens and the work is done on planned days, upstairs and downstairs.
Read more about living in the house during the build
On a double-storey extension the first floor opening usually comes through a bedroom or the landing, so that room is cleared and sheeted the day before, and a temporary wall keeps the weather out until the new room is ready to join.
Your project manager gives you one number to ring, the same trades return each day until their part is finished, and the house is closed up and secured every evening.
See Our Completed Extensions
Our portfolio shows a completed house extension in Wimbledon, a garden outhouse in Wimbledon and a complete home transformation. Customers on Checkatrade describe a double-storey side extension with a 6-metre rear and a team that turned up every day and finished within the agreed time and budget.
“Sam and his team did an amazing job building my kitchen extension.”
Checkatrade review
Watch Our Extensions
House extensions we have completed in Wimbledon and Thornton Heath, filmed when the work was finished.
Questions to Ask Before Building a Double-Storey Extension
Do I need planning permission for a double-storey extension?
Usually, yes. Permitted development only covers a two-storey rear extension up to 3 metres deep, at least 7 metres from the rear boundary and outside a conservation area. A double-storey side extension, or anything bigger, needs a householder planning application, which the council decides within 8 weeks.
How much does a double-storey extension cost?
A double-storey rear extension of about 40 m² over two floors typically costs £110,000 to £160,000 including VAT, or £2,600 to £3,500 per square metre. Within that range, the price depends mostly on the ground, the shape of the roof, the openings into the house and whether an upstairs bathroom is included. Every quote is itemised after the survey, with VAT included.
How long does a double-storey extension take to build?
A double-storey extension usually takes 16 to 24 weeks on site. Before that come the drawings and the planning decision, which takes up to 8 weeks once the application is validated, so the survey is the first step.
Is a double-storey extension better value than a single storey one?
Per square metre, usually yes, because the foundations, the roof and the scaffolding are shared between two floors. Adding a second storey later means strengthening or re-digging the foundations and taking off the old roof, so if you may want more space in future it is worth considering both floors now.
Can a second storey be built on top of my existing extension?
Sometimes. The existing foundations and walls have to be able to carry the extra load, which a trial hole and the structural engineer confirm. If they cannot, the foundations are underpinned or the ground floor walls are rebuilt as part of the work.
Will a double-storey extension take light from my neighbours?
This is the main thing the council checks. Most councils apply the 45 degree rule from the centre of the neighbour’s nearest window, and the design is drawn to pass it, which can mean setting the upper floor in from the boundary or keeping it shorter than the ground floor.
Do I need a party wall agreement?
On a semi-detached or terraced house, almost always. Notices are served at least one month before digging within 3 metres of a neighbour’s building and deeper than its foundations and two months before work to a shared wall. If the neighbour does not consent, a party wall surveyor draws up an award before work starts.
Can we live in the house during the build?
Yes, most families do. The new structure is built outside the existing walls, and the openings into the house on each floor are made on planned days once the extension is watertight, with dust screens and protection in the rooms affected.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
Two Floors, One Build Planned From the First Visit
The best double-storey extensions are designed as one house, not as a ground floor with a room on top: the stairs, the landing, the upstairs bathroom and the kitchen below are planned together, and if a loft conversion might follow, the structure is designed for it now.
Call or WhatsApp 07551 003647, or email sales@rightchoicebuilders.co.uk. Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office. Page last reviewed: October 2026.