Single-Storey Rear Extensions in London and Surrey
A single-storey rear extension opens the back of the house into the garden: one wide room for cooking, eating and living, usually built without a planning application.…
It is the extension most families start with, because it changes how the whole ground floor works for the cost of one new room. The old rear wall comes out, a steel carries the house above, and the kitchen, dining and living space become one, with glazing across the back.
Every extension is designed to a structural engineer’s calculations and built by our own trades, with the shell up within 6 weeks of the first day on site. It starts with a survey within 24 hours of your call that checks the ground, the drains and the trees.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
The Back of the House, Opened Into One Room
A single-storey rear extension builds out from the back wall of the house into the garden, under a flat roof with a lantern or roof lights, or a pitched roof where the house suits it. Across London and Surrey that usually means a kitchen diner on a Victorian terrace, an open-plan family room on an interwar semi, or a garden room across the back of a detached house.
The structure is straightforward: foundations, walls, one steel over the opening into the house and a new roof. That is why it is the quickest extension to build and the easiest to live through, and why most of the cost difference between one extension and another comes from the glazing, the roof and the kitchen rather than the building.

Which Rear Extension Suits Your House
How far you can build without an application depends on the type of house. The survey checks it before anything is drawn.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 4 options.
Permitted Development Extension
Up to 3 metres, or 4 on a detached house
Read more
Close
A rear extension of up to 3 metres on a terraced or semi-detached house, or 4 metres on a detached house, no more than 4 metres high, can usually be built without any application. Within 2 metres of a boundary the eaves must stay under 3 metres.
Larger Home Extension
Up to 6 metres, or 8 on a detached house
Read more
Close
Through the prior approval process, the same single-storey extension can go to 6 metres on a terraced or semi-detached house and 8 metres on a detached house. The neighbours are notified, and the council decides within 42 days.
Flat Roof With a Lantern
Daylight into the middle of the room
Read more
Close
A flat roof keeps the extension low against the neighbours and lets a roof lantern or roof lights bring daylight into the centre of a deep room, where windows in the rear wall cannot reach.
Kitchen Extension
Built around the kitchen you choose
Read more
Close
Most rear extensions are kitchen extensions, so the floor level, the drainage runs, the electrical points and the position of the doors are all set around the kitchen layout before the slab goes in.
Your Extension Shell Up in 6 Weeks
The shell of your single-storey extension is up within 6 weeks of the first day on site, or we credit £1,000 against your final invoice for every full week we run over, up to £3,000 in total.
- 6 weeks to a watertight shell
- £1,000 a week over, up to £3,000
- Single-storey extensions
Terms of the 6-week shell promise
Which projects it covers
Single-storey extensions (rear, side return and infill) built by Right Choice Builders under a signed written contract that includes the promise. It does not apply to loft conversions, double storey or wraparound extensions, renovations or other work.
What the shell means
Foundations, external walls, steel beams, the roof structure and roof covering, with the external doors and windows fitted (or temporary weatherproofing in their place), so that the extension is watertight.
When the 6 weeks start
On the agreed start date, when our team begins work on site. Before that date, planning permission (or confirmation that the work is permitted development), building control approval for the plans, any party wall agreements that are needed and the deposit set out in your contract must be in place.
What pauses the 6 weeks
Time lost to weather that makes it unsafe to work, changes you ask for after work has started, items or decisions you have agreed to supply or make arriving late, ground conditions that could not be seen at the survey (such as tree roots, poor soil or drains that have to be moved), utility companies, building control, the council or a party wall surveyor, restricted access to the site, or events outside our control.
If one of these happens, we tell you in writing as soon as we know, with the number of days added.
Payments
The promise applies when stage payments are made on time, as set out in your contract.
How the credit is given
£1,000 for every full week (7 days) the shell runs over, taken off your final invoice. The total credit is capped at £3,000. It is not paid as cash and cannot be exchanged.
Your rights
This promise is in addition to your legal rights as a consumer and does not affect them.
What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
Ground, Drains and Trees Come Before Design

Three things under the garden decide more of the price of a rear extension than the kitchen does. The ground, because London clay near trees needs deeper foundations; the drains, because a public sewer within 3 metres needs a build over agreement from Thames Water; and the trees, because roots close to the footings change the design.
The survey digs a trial hole, lifts the manholes and notes the trees and their species, so the engineer designs the foundations for the ground that is actually there, and the quote reflects it.
Holding Up the House When the Wall Comes Out

When the old rear wall is removed, a steel beam on padstones carries everything above it. The wider the opening, the larger the steel and the padstones, and where a return wall is removed as well, the engineer designs a goalpost frame so the corner of the house is supported.
Building control checks the calculations before the steel is ordered, and our own team installs it, so the opening is propped and finished in days. The new room is insulated to the current standard, with the glazing kept within the limits the regulations set.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
How Much Does a Single-Storey Rear Extension Cost?
A single-storey rear extension of 20 to 30 m² typically costs £65,000 to £110,000 including VAT, about £3,000 to £4,000 per square metre, with 12 to 16 weeks on site. That is the finished room, plastered and decorated, ready for the kitchen and the flooring.
| Type | Typical size | Guide price (inc VAT) | Time on site |
|---|---|---|---|
| Single-storey rear extension | 20–30 m², £3,000 – £4,000 per m² | £65,000 – £110,000 | 12–16 weeks |
| Side return extension | 10–15 m², £3,500 – £4,500 per m² | £45,000 – £70,000 | 9–12 weeks |
| Wraparound extension | 30–40 m², £3,200 – £4,000 per m² | £100,000 – £150,000 | 14–20 weeks |
Kitchens, bi-fold or sliding doors above the standard specification, and underfloor heating are priced separately.
Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.
Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.
Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.

Send a photo of the back of your house
A photo of the rear wall and the garden from the end of the garden is enough to start. We reply with a written price and book your free site survey within 24 hours.
Get your extension priceOr call 07551 003647, every day 9am to 5pm.
Your Rear Extension Quote, Itemised
The quote follows the survey and the drawings, and lists the build in the order it happens.
Your rear extension quote shows the total with VAT and carries the 6-week shell promise.

The sections of your quote
- Site preparation and excavation
- Foundations
- Drainage and surface water
- Walls and structure
- Steel and the opening into the house
- The roof, lantern and roof lights
- Windows and doors
- Internal works, first fix to decoration
- Compliance and certification
What moves the price
The ground first, then the width of the opening and the size of the steel, then the glazing and the roof. The kitchen and finishes you supply are listed as exclusions, so another quote can be compared line by line.
Your Rear Extension, Step by Step
-
A Survey Within 24 Hours of Your Call
We measure the house and garden, dig a trial hole, lift the manholes and note the trees, so the design starts from the ground.
-
Drawings and the Planning Route
Drawings and the engineer's calculations are prepared, with a lawful development certificate or prior approval as the size requires.
-
Notices and Agreements
Party wall notices are served, the build over agreement applied for where a sewer is close, and building regulations approved.
-
The Shell Up Within 6 Weeks
Foundations, walls, steel and roof go up outside the existing house, watertight with the doors fitted within 6 weeks of the first day.
-
Fit-Out and Sign-Off
The old wall comes out, the kitchen and finishes go in, and building control issues the completion certificate.
Keeping the Kitchen Working
The extension is built outside the existing rear wall, so the old kitchen keeps working until the new room is watertight.
While the shell goes up
The old kitchen stays in use because the new room is built outside it.
Once the wall comes out
A temporary kitchen is set up in another room until the new one is fitted.
See Our Completed Rear Extensions
Our portfolio includes a house extension in Wimbledon, a garden outhouse in Wimbledon and a new kitchen in Catford.
“Sam and his team did an amazing job building my kitchen extension.”
Checkatrade review
Rear Extensions on Video
A rear extension in Wimbledon, built with a garden outhouse at the same time, and an extension in Thornton Heath.
Questions About Single-Storey Rear Extensions
How far can I extend without planning permission?
Up to 3 metres beyond the original rear wall on a terraced or semi-detached house, or 4 metres on a detached house, at single storey and up to 4 metres high. Through prior approval it can go to 6 and 8 metres. Conservation areas, flats and listed buildings need an application.
How long does a rear extension take?
The shell is up within 6 weeks of the first day on site, or we credit £1,000 for every full week over, up to £3,000 in total. A single-storey rear extension usually takes 12 to 16 weeks on site in total.
Do I need a build over agreement?
If any part of the extension sits over or within 3 metres of a public sewer, yes. In London rear gardens that is common, because most shared drains became public sewers in 2011. The survey finds the pipe and we apply for the agreement.
Bifold or sliding doors?
Sliding doors give more glass for the same opening; bifolds open the whole wall in summer. Both count towards the glazing limit the regulations set for the extension, which is why the choice is made at the design stage.
Who supplies the kitchen?
Normally you do, and it is listed as an exclusion on the quote so you can choose it freely. Our own plumbers and electricians fit it, so the certificates come with the finished room.
Can the extension be built higher later?
If you might add a storey in future, the foundations can be dug to double storey depth now for a fraction of the cost of underpinning later. The survey asks what you might want in five years as well as now.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
One Room That Changes the Whole House
A rear extension is rarely about the square metres alone. It is about the kitchen being where the family is, and the garden being part of the house. The survey starts with how you live, then works out the build.
Call or WhatsApp 07551 003647, or email sales@rightchoicebuilders.co.uk. Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office. Page last reviewed: October 2026.




