Skip to content
Family-run for 28 yearsCheckatrade 9.71 out of 10 (opens in a new tab)FMB memberGas Safe registered
07551 003647 Open nowEvery day, 9am to 5pm
07551 003647 Open nowEvery day, 9am to 5pm Get a price

Wraparound Extensions in London and Surrey

A wraparound extension builds along the side and across the back of the house in one L-shaped structure, creating the widest and deepest ground floor any extension can give.…

On a Victorian terrace it fills the side return and the space behind the outrigger at once; on a semi or detached house it wraps the corner of the house to make one large kitchen, dining and living space. It is the extension that most changes how a house is used.

A wraparound usually needs planning permission and a more involved structural design, so it starts with a survey within 24 hours of your call and a careful look at the boundaries and the neighbours’ windows.

Book a Survey Within 24 Hours

Free and without obligation, anywhere across London and Surrey.

FMB inspected member. 28 years in the trade. Call 07551 003647.

Contemporary house extension with a roof lantern and bifold doors

Side and Rear, Built as One Structure

A wraparound joins a side extension and a rear extension into one L-shaped room. On a terraced house the side part fills the narrow side return beside the outrigger; on a semi-detached or detached house it extends along the side of the house before turning across the back.

Because the old walls come out in two directions, the steelwork is the heart of the design: a structural engineer designs the beams and posts that carry the house above both openings. We build wraparounds with our own trades from the foundations to the finishes, with glazing, roof lights and lanterns placed so daylight reaches every part of the new room.

South London open plan kitchen island renovation

Wraparound Layouts

The type of house decides the shape. The survey looks at the plot, the boundaries and the existing rooms before anything is drawn.

Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 3 options.

Aerial view of rear extensions and a dormer loft conversion

Terrace Side Return and Rear

The classic Victorian wraparound Read more Close

On a period terrace, the side return beside the outrigger and the space behind it are built over together, turning a narrow galley kitchen and a separate back room into one wide space across the full width of the house.

Rear extension and dormer loft conversion on a terraced house

Semi-Detached Corner Wrap

Along the side and across the back Read more Close

On a semi-detached house, the extension runs along the side of the house, often replacing a garage or passage, and turns across the back, joining a utility or study at the side with the kitchen and family room behind.

South London open plan kitchen island renovation

Open-Plan Family Kitchen

One room for cooking, eating and living Read more Close

The most common use for a wraparound is a single open-plan room with distinct areas for cooking, dining and sitting, with an island at the centre and roof lights over the parts furthest from the glazing.

What Our Customers Say on Google

Every review below comes straight from our Google Business Profile, in the customer's own words.

Posted on Google Google
Stacy profile picture
Stacy
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
It is always hard to find a reliable and trust worthy tradesman! you hear so many stories about cowboy builders and it puts you off getting work done. Sami was recommended to me by a friend who he had worked for before. I am so glad that I was put in touch with him! the work was completed within the time frame, under the budget and more importantly to an exceptional standard!
Posted on Google Google
Eric Fox’s profile picture
Eric Fox’s
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Sam and his team built our loft extension to a high standard. They involved the building inspectors at every step of the way, and creatively found solutions to unexpected problems. They are very skilled, and worked with great professionalism - arriving on time every day, and keeping the lines of communication clear.
Posted on Google Google
clive stewart profile picture
clive stewart
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Right choice builders did an excellent job on my kitchen renovation they were very approachable and kept me informed at every stage 👍
Posted on Google Google
Mei Wong profile picture
Mei Wong
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We recently had our loft converted and home renovated by Right Choice Builders, and we’re extremely happy with the results. The team was reliable, efficient, and completed the work to a high standard. Communication was clear throughout, and they kept everything tidy and on schedule. The finished space looks fantastic – solid workmanship and great attention to detail. Highly recommend for anyone looking for a trustworthy and skilled building team.
Posted on Google Google
Mariam Layla Yahya profile picture
Mariam Layla Yahya
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
So happy with the renovation work done by Sami. New kitchen, bathroom, and the knocked through walls have completely transformed the space. He was friendly, reliable, and really paid attention to detail. It honestly feels like a brand new home, deffo five stars!

Planning a Wraparound

Planning drawings and project paperwork laid out on a desk

Permitted development treats a side extension and a rear extension separately, and a wraparound that combines them generally falls outside it, so in most cases a householder planning application is needed. The council looks mainly at the effect on the neighbours, particularly the height of the side wall along the boundary and the light reaching their windows.

The design responds to that from the start: a lower wall height along the boundary, a sloping or stepped roof where it meets a neighbour, and roof lights rather than high walls. The council decides within 8 weeks of validating the application.

Steelwork in Two Directions

Steel frame of a wraparound extension going up across the side return and rear

With the rear wall and the side wall both opening up, the house above has to be supported at the corner as well as along each opening. The engineer usually designs a frame of beams and posts, sometimes a goalpost frame on each side, bearing on new foundations, so the corner of the house stands on its own structure.

On a terrace, the side return wall is on or close to the boundary, so party wall notices are served for the new footings and for any work to the shared wall, and the roof where it meets the neighbour’s wall is detailed carefully to keep both houses watertight.

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

How Much Does a Wraparound Extension Cost?

Wrapping the extension around the side return and the rear adds 30 to 40 m² for typically £100,000 to £150,000 including VAT, with 14 to 20 weeks on site. Per square metre it sits between a side return and a straight rear extension, because the narrow side section costs more to build than open space at the back.

Type Typical size Guide price (inc VAT) Time on site
Wraparound extension 30–40 m², £3,200 – £4,000 per m² £100,000 – £150,000 14–20 weeks
Single-storey rear extension 20–30 m², £3,000 – £4,000 per m² £65,000 – £110,000 12–16 weeks
Side return extension 10–15 m², £3,500 – £4,500 per m² £45,000 – £70,000 9–12 weeks

Kitchens, bi-fold or sliding doors above the standard specification, and underfloor heating are priced separately.

Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.

Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.

Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.

Get Your Quote
Rear extension and dormer loft conversion on a terraced house

Send a photo of the side and back of your house

Photos of the side return or the side of the house, and of the rear wall, are enough to start. We reply with a written price and book your free site survey within 24 hours.

Get your extension price

Or call 07551 003647, every day 9am to 5pm.

Your Wraparound Quote, Itemised

The side and rear parts are priced together, with the steelwork shown as its own section.

With VAT in the total, the quote sets out the side and rear structure and the fit-out as separate sections.

Roof joists going on over a new extension
The sections of your quote
  • Site preparation and excavation
  • Foundations and drainage
  • Walls and structure
  • Steel frame and the openings into the house
  • The roof, lanterns and roof lights
  • Windows and doors
  • Party wall details along the boundary
  • Internal works, first fix to decoration
  • Compliance and certification
What moves the price

The steel frame first, then the length of boundary wall and the party wall details, then the glazing and roof lights. The quote prices each of them on its own line.

Your Wraparound Extension, Step by Step

  1. A Survey Within 24 Hours of Your Call

    We measure the house and plot, check the boundaries and the neighbours' windows, dig a trial hole and locate the drains.

  2. Design and Planning Application

    The design is drawn to respect the neighbours, and the householder application is submitted.

  3. Engineering and Notices

    The engineer designs the steel frame, building regulations are approved and party wall notices served.

  4. The Shell Built First

    The structure is built outside the existing walls and made watertight before the old walls are opened up.

  5. Opening Up, Fit-Out and Sign-Off

    The old walls come out under the new steel, the kitchen and finishes go in, and building control signs it off.

Living at Home During a Wraparound

The new structure goes up outside the house first, so the existing kitchen keeps working until the shell is watertight.

While the shell goes up

The house works as normal, with the new walls built outside the old ones.

When the walls come out

A temporary kitchen is set up elsewhere until the new room is finished.

Contemporary house extension with a roof lantern and bifold doors

See Our Completed Extensions

Our portfolio includes a house extension in Wimbledon and a complete home transformation, with more on our extensions page.

Our rating stands at 5 stars on Google and 9.71 out of 10 on Checkatrade.
  • 5 stars on Google
  • 9.71 out of 10 on Checkatrade

Watch Our Extensions

Two of our finished extension projects, in Wimbledon and Thornton Heath.

House extension and garden outhouse in Wimbledon Watch on YouTube (opens in a new tab)

Questions About Wraparound Extensions

Does a wraparound extension need planning permission?

In most cases, yes. Permitted development covers side and rear extensions separately, and a wraparound that combines them generally needs a householder application, decided within 8 weeks of validation.

How long does a wraparound take to build?

A wraparound extension usually takes 14 to 20 weeks on site. The side and rear structure is built and made watertight first, and the fit-out follows.

Why is the steelwork more complex?

Because walls come out in two directions, the corner of the house needs its own support as well as each opening. The engineer designs a frame of beams and posts on new foundations.

Will the side wall affect my neighbour?

That is the council’s main concern. The design keeps the wall along the boundary as low as possible and uses roof lights for daylight, and party wall notices are served for the work near the shared wall.

Can a wraparound include a utility or WC?

Yes, often in the side part, where the drainage is already being run. It appears as its own lines on the quote.

Is a wraparound better than a rear extension?

It gives more space and a better-shaped room, especially on a terrace with a narrow side return, but it costs more and usually needs planning. The survey shows you what each option gives on your house.

Book Your Free Site Survey

Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

Or call 07551 003647
Completed home extension exterior built by Right Choice Builders

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    The Whole Ground Floor, Rethought in One Build

    A wraparound is the chance to redesign how the ground floor works, not just to add to it. The survey looks at the whole floor before the new walls are drawn.

    Tell us how the ground floor works now and how you want it to work, and the survey is booked within 24 hours.

    07551 003647
    Book Your Survey Free, no obligation, and the advice is yours to keep.