Wraparound Extensions in London and Surrey
A wraparound extension builds along the side and across the back of the house in one L-shaped structure, creating the widest and deepest ground floor any extension can give.…
On a Victorian terrace it fills the side return and the space behind the outrigger at once; on a semi or detached house it wraps the corner of the house to make one large kitchen, dining and living space. It is the extension that most changes how a house is used.
A wraparound usually needs planning permission and a more involved structural design, so it starts with a survey within 24 hours of your call and a careful look at the boundaries and the neighbours’ windows.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
Side and Rear, Built as One Structure
A wraparound joins a side extension and a rear extension into one L-shaped room. On a terraced house the side part fills the narrow side return beside the outrigger; on a semi-detached or detached house it extends along the side of the house before turning across the back.
Because the old walls come out in two directions, the steelwork is the heart of the design: a structural engineer designs the beams and posts that carry the house above both openings. We build wraparounds with our own trades from the foundations to the finishes, with glazing, roof lights and lanterns placed so daylight reaches every part of the new room.

Wraparound Layouts
The type of house decides the shape. The survey looks at the plot, the boundaries and the existing rooms before anything is drawn.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 3 options.
Terrace Side Return and Rear
The classic Victorian wraparound
Read more
Close
On a period terrace, the side return beside the outrigger and the space behind it are built over together, turning a narrow galley kitchen and a separate back room into one wide space across the full width of the house.
Semi-Detached Corner Wrap
Along the side and across the back
Read more
Close
On a semi-detached house, the extension runs along the side of the house, often replacing a garage or passage, and turns across the back, joining a utility or study at the side with the kitchen and family room behind.
Open-Plan Family Kitchen
One room for cooking, eating and living
Read more
Close
The most common use for a wraparound is a single open-plan room with distinct areas for cooking, dining and sitting, with an island at the centre and roof lights over the parts furthest from the glazing.
What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
Planning a Wraparound

Permitted development treats a side extension and a rear extension separately, and a wraparound that combines them generally falls outside it, so in most cases a householder planning application is needed. The council looks mainly at the effect on the neighbours, particularly the height of the side wall along the boundary and the light reaching their windows.
The design responds to that from the start: a lower wall height along the boundary, a sloping or stepped roof where it meets a neighbour, and roof lights rather than high walls. The council decides within 8 weeks of validating the application.
Steelwork in Two Directions

With the rear wall and the side wall both opening up, the house above has to be supported at the corner as well as along each opening. The engineer usually designs a frame of beams and posts, sometimes a goalpost frame on each side, bearing on new foundations, so the corner of the house stands on its own structure.
On a terrace, the side return wall is on or close to the boundary, so party wall notices are served for the new footings and for any work to the shared wall, and the roof where it meets the neighbour’s wall is detailed carefully to keep both houses watertight.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
How Much Does a Wraparound Extension Cost?
Wrapping the extension around the side return and the rear adds 30 to 40 m² for typically £100,000 to £150,000 including VAT, with 14 to 20 weeks on site. Per square metre it sits between a side return and a straight rear extension, because the narrow side section costs more to build than open space at the back.
| Type | Typical size | Guide price (inc VAT) | Time on site |
|---|---|---|---|
| Wraparound extension | 30–40 m², £3,200 – £4,000 per m² | £100,000 – £150,000 | 14–20 weeks |
| Single-storey rear extension | 20–30 m², £3,000 – £4,000 per m² | £65,000 – £110,000 | 12–16 weeks |
| Side return extension | 10–15 m², £3,500 – £4,500 per m² | £45,000 – £70,000 | 9–12 weeks |
Kitchens, bi-fold or sliding doors above the standard specification, and underfloor heating are priced separately.
Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.
Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.
Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.

Send a photo of the side and back of your house
Photos of the side return or the side of the house, and of the rear wall, are enough to start. We reply with a written price and book your free site survey within 24 hours.
Get your extension priceOr call 07551 003647, every day 9am to 5pm.
Your Wraparound Quote, Itemised
The side and rear parts are priced together, with the steelwork shown as its own section.
With VAT in the total, the quote sets out the side and rear structure and the fit-out as separate sections.

The sections of your quote
- Site preparation and excavation
- Foundations and drainage
- Walls and structure
- Steel frame and the openings into the house
- The roof, lanterns and roof lights
- Windows and doors
- Party wall details along the boundary
- Internal works, first fix to decoration
- Compliance and certification
What moves the price
The steel frame first, then the length of boundary wall and the party wall details, then the glazing and roof lights. The quote prices each of them on its own line.
Your Wraparound Extension, Step by Step
-
A Survey Within 24 Hours of Your Call
We measure the house and plot, check the boundaries and the neighbours' windows, dig a trial hole and locate the drains.
-
Design and Planning Application
The design is drawn to respect the neighbours, and the householder application is submitted.
-
Engineering and Notices
The engineer designs the steel frame, building regulations are approved and party wall notices served.
-
The Shell Built First
The structure is built outside the existing walls and made watertight before the old walls are opened up.
-
Opening Up, Fit-Out and Sign-Off
The old walls come out under the new steel, the kitchen and finishes go in, and building control signs it off.
Living at Home During a Wraparound
The new structure goes up outside the house first, so the existing kitchen keeps working until the shell is watertight.
While the shell goes up
The house works as normal, with the new walls built outside the old ones.
When the walls come out
A temporary kitchen is set up elsewhere until the new room is finished.
See Our Completed Extensions
Our portfolio includes a house extension in Wimbledon and a complete home transformation, with more on our extensions page.
Watch Our Extensions
Two of our finished extension projects, in Wimbledon and Thornton Heath.
Questions About Wraparound Extensions
Does a wraparound extension need planning permission?
In most cases, yes. Permitted development covers side and rear extensions separately, and a wraparound that combines them generally needs a householder application, decided within 8 weeks of validation.
How long does a wraparound take to build?
A wraparound extension usually takes 14 to 20 weeks on site. The side and rear structure is built and made watertight first, and the fit-out follows.
Why is the steelwork more complex?
Because walls come out in two directions, the corner of the house needs its own support as well as each opening. The engineer designs a frame of beams and posts on new foundations.
Will the side wall affect my neighbour?
That is the council’s main concern. The design keeps the wall along the boundary as low as possible and uses roof lights for daylight, and party wall notices are served for the work near the shared wall.
Can a wraparound include a utility or WC?
Yes, often in the side part, where the drainage is already being run. It appears as its own lines on the quote.
Is a wraparound better than a rear extension?
It gives more space and a better-shaped room, especially on a terrace with a narrow side return, but it costs more and usually needs planning. The survey shows you what each option gives on your house.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
The Whole Ground Floor, Rethought in One Build
A wraparound is the chance to redesign how the ground floor works, not just to add to it. The survey looks at the whole floor before the new walls are drawn.
Call or WhatsApp 07551 003647, or email sales@rightchoicebuilders.co.uk. Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office. Page last reviewed: October 2026.




