Lawful development certificate
£274 Proposed work
A lawful development certificate puts the council's confirmation in writing and is what a buyer's solicitor will ask for when you sell.
Family-run for 28 years. Rated 9.71 out of 10 on Checkatrade. FMB member, Gas Safe registered, NAPIT registered and TrustMark.
The house has run out of bedrooms and moving would cost more than the room you need…
A loft conversion by Right Choice Builders adds a bedroom and bathroom under your own roof, built by our own trades to a structural engineer's design and inspected by building control at every stage.
The first step is a loft survey within 24 hours of your call, because ridge height, roof shape and stair position decide the whole job before anything is drawn.
Free and without obligation, anywhere across South London.
FMB inspected member. Call 07551 003647.
Right Choice Builders converts lofts across South London, from Peckham and Lewisham to Croydon, Wimbledon and Sutton, building rear dormer, hip-to-gable, L-shaped, mansard and rooflight conversions on Victorian terraces, interwar semis and end of terrace houses.
Every loft is designed to a structural engineer's calculations, built by our own Gas Safe and NAPIT registered trades, and carries a 12-month workmanship warranty.
The roof you already have decides the conversion you should build, which is why the survey looks at the outside before anyone talks about the inside.
Houses built from the 1960s onward often have trussed roofs, where the W-shaped timbers are structural and cannot simply be cut out. Those lofts can still be converted, but they need new steels and rafters designed in first, which is exactly what the survey identifies.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all five roof types.
A rear dormer builds a box out of the back slope of the roof, giving full head height across most of the loft and a flat ceiling where the bed goes. On a mid-terrace or semi it normally sits inside the permitted development allowance, provided it stays 20 centimetres back from the eaves and uses tiles and cladding that match the house, so most South London dormers need no planning application at all.
Where the roof slopes down at the side as well as the back, a hip-to-gable conversion straightens that side slope into a vertical wall, which turns a cramped triangle into a usable room. It adds a great deal of volume, and because it uses most of the 50 cubic metre allowance on a semi, adding a rear dormer as well often tips the scheme into a planning application, which the survey will tell you before you decide.
Victorian and Edwardian terraces across Peckham, Lewisham and Catford usually have a rear addition, the outrigger, with its own lower roof. An L-shaped dormer runs a dormer over both roofs and joins them, which is how a two-bedroom loft with a shower room fits on a terrace that looked too small for one.
A mansard replaces one whole slope of the roof with a near-vertical wall and a shallow top, giving the largest and squarest room of any conversion. It changes the shape of the building, so it normally needs planning permission, and in some conservation areas it is the option a council will accept where it refuses a box dormer.
Where the ridge is high enough, a rooflight conversion fits windows into the existing slope and leaves the roof line alone, which keeps cost, disruption and planning risk to a minimum. It suits steep Victorian roofs, and because rooflights keep their permitted development rights even in a conservation area, provided they project no more than 150 millimetres, it is often the only route there that needs no application.
Every review below comes straight from our Google Business Profile, in the customer's own words.
A loft conversion is decided at the top of the stairs, because Approved Document K requires 2 metres of headroom over the new staircase, reducing to 1.9 metres at the centre and 1.8 metres at the edge where a sloping ceiling runs above it.
Many Victorian roofs clear that only just.
The survey measures from the top of the ceiling joists to the underside of the ridge before anything else is discussed.
On a steep roof this may be enough on its own, and it leaves the roof line untouched.
Placed over the stair, a dormer gives the headroom exactly where the regulations demand it.
This buys height at the price of replastering the rooms below.
This buys the most, but it changes the outline of the house and needs planning permission. Applications in East Dulwich show raises of 200 to 400 millimetres being sought for exactly this reason.
Sami and the team settle the stair position at the survey, since putting the new flight directly over the existing one usually saves a bedroom on the first floor. That decision fixes the structure and the fire strategy for everything that follows.
The survey also fixes where the daylight comes from, since a loft with a single small window is the regret homeowners report most often. A dormer or a pair of rooflights placed for light costs little extra when it is designed in from the start.
The joists you can see in your loft are ceiling joists, sized to hold a plasterboard ceiling and nothing else, so the new floor sits on its own joists bearing on steel beams that a structural engineer calculates for your house.
Building control checks those calculations before the steels go in, and the ceiling below normally survives intact because the new floor never bears on it.
The conversion also changes the floors below, because a loft turns a two-storey house into a three storey one.
Once the new floor is more than 4.5 metres above ground level, seven things have to change with it, and each one answers to a named authority.
All four are closed. Open any of them to read the requirements in full.
Because every one of those sits with a named body, the completion certificate and the trade certificates arrive together at the end rather than trickling in for months afterwards.
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

BarkA marketplace for local services. Reviews are written by customers after the job is done.
Snap the hatch, the roof space or the room below it. We reply with a written price and book your free loft survey within 24 hours.
Get your loft priceOr call 07551 003647, every day 9am to 5pm.
Most rear dormer and rooflight conversions on South London houses fall within permitted development.
This allows added roof space without a full planning application, provided the conversion stays within the volume allowance and follows the rules for its position, materials and windows.
That allowance runs over the life of the house, so a dormer a previous owner built counts against it. This is why the survey checks the planning history before anything is drawn.
The orange band is the 25 to 35 cubic metres a generous rear dormer on a London terrace already uses. Both scales run from 0 to 50 cubic metres, and the ticks mark every 10.
£274 Proposed work
A lawful development certificate puts the council's confirmation in writing and is what a buyer's solicitor will ask for when you sell.
£548 Application fee
Flats, maisonettes, listed buildings and houses in conservation areas need a full householder application.
In a conservation area every dormer needs an application. A mansard or rear dormer scheme is often approved where a full-width box is refused, and a rooflight scheme needs no application at all.
Both fees apply in England to applications made before 8 December 2026. Regulations laid in Parliament are due to raise the householder fee to £575 on that date, with the certificate at half of that. We confirm the fee that applies with your quote. Fees checked November 2026. The design and build contract explains each route and who is the applicant.
The roof shape sets most of the cost of a loft conversion, because it decides how much new structure the room needs. These guide prices show what each type usually comes to, and how long it takes on site.
| Type | Best for | Guide price (inc VAT) | Time on site |
|---|---|---|---|
| Rooflight conversion | Lofts with good headroom already | £30,000 – £45,000 | 5–7 weeks |
| Rear dormer | Terraces and semis | £50,000 – £70,000 | 7–10 weeks |
| Hip-to-gable with rear dormer | Semis and detached houses with hipped roofs | £65,000 – £85,000 | 9–12 weeks |
| L-shaped dormer | Victorian and Edwardian terraces | £65,000 – £90,000 | 9–12 weeks |
| Mansard | Maximum space, often needs planning | £75,000 – £110,000 | 12–16 weeks |
| Add an en-suite shower room | Any loft conversion | + £8,000 – £15,000 | — |
Prices assume about 30 m² of new floor space with one bedroom.
Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.
Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.
Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.
The quote follows the survey and your drawings and runs to nine sections that follow the loft in the order it is built.
Each section lists the materials and the work, the total is stated including VAT so nothing is added afterwards.
What moves the price is roof shape first, since a hip-to-gable or mansard involves far more structure than a rear dormer, then the span of the steels, whether an en suite is included, the state of the existing roof covering, and the planning and party wall fees that apply to your house.
Each of those appears as its own line, so you can see which one is doing the work.
The compliance section names what the price includes, such as building control fees, the structural sign off, scaffold, waste removal and the gas, electrical and FENSA certificates.
The exclusions section names what it leaves out, such as bathroom fittings and flooring you may prefer to choose yourself.
Where you want the loft to include an en suite, our own plumbers fit it under the same programme and the bathroom fitting appears as its own lines.
We measure ridge height, roof pitch and floor area, find the stair position, and check where the tank, the boiler and the chimney breasts sit, then tell you which conversion your roof will take.
Planning drawings, Building Regulations drawings and the structural engineer's calculations are produced under the design and build contract, or priced from drawings you already hold.
The lawful development certificate is applied for where the scheme is permitted development, the householder application is submitted where it is not, and party wall notices go to both neighbours on a terrace once the drawings are fixed.
Nine sections, VAT included, with the programme agreed in writing before the scaffold is ordered.
Our own trades build from the scaffold, building control inspects the steels, the floor, the fire measures and the insulation as they go in, and you receive the completion certificate, the trade certificates and a 12-month workmanship warranty.
Most of a loft conversion happens above your ceiling and outside your house, because the structure, the dormer and the roof are built from the scaffold before the staircase opening is cut.
While the shell goes up
The household carries on underneath, with noise as the main disruption.
Once the opening is cut
The first floor landing becomes the route in and out for the trades.
You are told in advance when the opening is coming through, since that is the one moment the work arrives inside the home.
The carpet is protected, the landing is cleared with you the night before, and the fire doors on the landing rooms go in as part of the same visit.
Your project manager gives you one number to ring, and the same trades return each day until their part is finished.
Our portfolio of completed building projects includes a loft conversion and refurbishment in Sutton, with photographs of the finished rooms, alongside completed projects in Catford, Mitcham, Lewisham and Wimbledon. Customers on Checkatrade describe a team that turned up every day, involved the building inspector at each stage and finished within the agreed time and budget.
“Highly recommend Right Choice Builders, carried out my loft conversion to a great standard.”
Checkatrade review
We convert lofts across South London and Surrey, from the Victorian terraces of Fulham, Wimbledon and Beckenham to the interwar semis of Raynes Park, Surbiton, Epsom and Cheam.
Each council reads the permitted development rules and its conservation areas a little differently, so we check the rules for your street before the design starts.
Where a loft is planned alongside a rear extension or a full re-roof, both are priced and built under one programme.
Up to 40 cubic metres of added roof space on a terraced house and 50 cubic metres on a semi-detached or detached house, under current permitted development rules, provided the dormer stays off the road-facing slope and matches the house. The figure is cumulative, so earlier roof additions count. Flats, listed buildings and conservation areas fall outside those rights and need an application.
Two metres of clear height over the new staircase is the figure the regulations work from, reducing to 1.9 metres at the centre and 1.8 metres at the edge under a sloping ceiling. Measure from the top of the ceiling joists to the underside of the ridge: at 2.2 metres or more a conversion is comfortable, and at around 2 metres it is usually possible with a dormer placed over the stair.
No, most customers stay, because the structure and dormer are built from the scaffold before the staircase opening is cut. You are told the day the opening is coming and the landing rooms get their fire doors in the same visit.
Yes, provided it has a building control completion certificate, which is issued once the steels, floor, stairs, fire measures and insulation have been inspected. Without that certificate a buyer's solicitor treats the room as storage, which is why every Right Choice Builders loft ends with the certificate in your hand.
They come out of the way at the survey stage, since a cold water tank sits where the bed wants to be. The usual answer is a combi boiler that removes the tank altogether, fitted and certified by our own Gas Safe engineers as part of the same quote.
Yes, and most of our loft conversions include one. The soil pipe route and the water pressure at the top of the house are checked at the survey, and the shower room is fitted by our own plumbers with its extractor and electrics certified by our own electricians.
Often, yes. Building control can inspect existing work and issue a regularisation certificate where it meets the standards, and where it does not, the shortfall is usually the stair, the fire measures or the floor structure, all of which can be brought up to standard. The survey tells you which of those applies before any price is given.
Is there something else you would like to ask?
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
Tell us your ridge height, roof shape and postcode, and the survey will tell you which conversion fits.
07551 003647