HMO and Property Development Builders in London and Surrey
Building work for landlords, investors and developers: HMO conversions and compliance upgrades, houses split into flats, new build homes and commercial buildings turned into homes.…
Investment projects are judged on different numbers from a family home: the licence, the number of lettable rooms or units, the weeks the building earns nothing and the cost of putting things right after an inspection. We plan the build around those numbers, from the planning route to the paperwork the council, the lender and the buyer will ask for.
Every project starts with a site survey within 24 hours of your call, and the quote is itemised so it can sit in your appraisal line by line.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
Building for Rental and Resale, Not Only for Living In
Right Choice Builders works with landlords, portfolio investors and small developers across London and Surrey on projects where the building has to earn its keep. That means rooms sized to the licensing standards, fire safety designed in from the first drawing, sound separation between units that passes testing, and finishes chosen to survive years of tenancies.
Our own trades carry the structure, the plumbing and the electrics, which keeps the programme in one set of hands, and each project ends with the certificates you need to let, sell or refinance: the building control completion certificate, the electrical and gas certificates, and the fire safety records the council expects to see.

What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
Planning Comes First on Investment Projects

Most investment projects are decided by planning before they are decided by building. Turning a family house into a small HMO for three to six people is normally permitted development, but many London boroughs have Article 4 directions that remove that right, so a planning application is needed. HMOs for seven or more people, houses split into flats and new build homes need full planning permission, while some commercial buildings can become homes through the prior approval route instead.
We check the planning position for the address before anything is designed. Where an application is needed, the drawings are prepared with the build cost in mind, so the scheme the council approves is one that still works on paper.
Licensing, Regulations and the Paperwork at the End

An HMO with five or more tenants from two or more households needs a mandatory licence from the council, and many boroughs license smaller HMOs too. Flats created from a house have to meet the building regulations as new homes, including fire separation and sound insulation between them, and new build homes add energy, overheating and electric vehicle charging requirements.
We build to those standards and collect the certificates as the work goes, so the paperwork is complete when the licence application, the valuation or the sale needs it rather than chased afterwards.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
Watch Our Projects on YouTube
Finished projects filmed on site by our own team. Each video opens on our YouTube channel, where you can see the rest.
-
Video
South Croydon full renovation, before and after
(opens on YouTube in a new tab)
-
Video
House extension and garden outhouse in Wimbledon
(opens on YouTube in a new tab)
-
Video
Completed kitchen in Catford
(opens on YouTube in a new tab)
-
Video
Completed works in Surbiton
(opens on YouTube in a new tab)
HMO and Property Development Questions From Landlords
Do I need planning permission to convert a house into an HMO?
A house for three to six unrelated tenants (a small HMO) can usually be created without planning permission, unless the council has an Article 4 direction for the area, which many London boroughs do. An HMO for seven or more people always needs planning permission. We check the position for your address before any design work.
Can you build from my architect's drawings?
Yes. We price from drawings you already have, or produce the planning and building regulations drawings ourselves under the same contract. Either way the quote is itemised, so it can be checked against your appraisal.
Do you build to the council's HMO standards?
Yes. Bedrooms are sized to the national minimums of 6.51 m² for one adult and 10.22 m² for two, kitchens and bathrooms to the council’s amenity standards, and fire safety to the level the council’s guidance sets for the size of the HMO. Some boroughs set higher standards, so we work from your council’s own document.
Which certificates do I get at the end?
The building control completion certificate, electrical installation certificates, gas safety records from our Gas Safe registered engineers and the commissioning certificate for the fire alarm system, as applicable to the job. They are what a licensing officer, a lender or a buyer’s solicitor will ask for.
What size of new build projects do you take on?
Any size. We build single replacement houses and infill homes as well as larger developments of several houses or flats, with the same team running the groundworks, the structure and the fit-out.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
Plan the Build Around the Numbers That Matter
On a rental or development project the build cost is only one line of the appraisal. The survey looks at what the planning route, the licence and the programme mean for the return, so the decisions that affect it are made before the first wall comes down.
Call or WhatsApp 07551 003647, or email sales@rightchoicebuilders.co.uk. Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office. Page last reviewed: October 2026.




