Skip to content
Family-run for 28 yearsCheckatrade 9.71 out of 10 (opens in a new tab)FMB memberGas Safe registered
07551 003647 Open nowEvery day, 9am to 5pm
07551 003647 Open nowEvery day, 9am to 5pm Get a price

Change of Use Conversions: Commercial to Residential

Change of use conversions that turn offices, shops and other commercial buildings into homes, through prior approval or full planning, built to the building regulations for new dwellings.…

Turning a commercial building into homes can unlock value in a building that no longer works for its original use, but the route matters. Some conversions can go through the quicker prior approval process; others need full planning permission, and in parts of London the council has removed the faster route altogether.

It starts with a survey within 24 hours of your call, and a check of the building’s use, its planning history and any Article 4 direction.

Book a Survey Within 24 Hours

Free and without obligation, anywhere across London and Surrey.

FMB inspected member. 28 years in the trade. Call 07551 003647.

Living room part way through a renovation, with building materials stacked

A Commercial Building, Turned Into Homes

A change of use conversion takes a building used as an office, a shop or another commercial use and turns it into one or more homes. The building usually needs to be stripped back, divided into flats with new fire and sound separation, given new services and windows that light every habitable room, and insulated to the standard of a new home.

We build change of use conversions for investors and developers across London and Surrey, from the strip-out to the completion certificate, working from your approval or helping to establish the right planning route first.

Ground floor stripped to the joists during a whole house renovation

Routes to a Change of Use

The building’s current use, its location and its planning history decide which route applies.

Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 3 options.

Walls opened up to the studs during a full house renovation

Prior Approval (Class MA)

Commercial, business and service uses to homes Read more Close

Buildings in the commercial, business and service use class, such as offices and many shops, can be converted to homes through prior approval if they have been in that use for the previous two years. Since March 2024 there is no floor area limit and no requirement for the building to have been vacant.

Planning drawings and project paperwork laid out on a desk

Full Planning Permission

Where prior approval does not apply Read more Close

Where the building is in another use, the scheme includes extensions or external changes beyond the prior approval, or an Article 4 direction has removed the right, a full planning application is needed.

Bright, newly refurbished room with oak flooring

Flats Over Shops

Upper floors brought back into use Read more Close

The upper floors of high street buildings, often used as storage, can be converted into flats while the shop stays below, with a separate entrance and fire separation from the commercial unit.

What Our Customers Say on Google

Every review below comes straight from our Google Business Profile, in the customer's own words.

Posted on Google Google
Stacy profile picture
Stacy
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
It is always hard to find a reliable and trust worthy tradesman! you hear so many stories about cowboy builders and it puts you off getting work done. Sami was recommended to me by a friend who he had worked for before. I am so glad that I was put in touch with him! the work was completed within the time frame, under the budget and more importantly to an exceptional standard!
Posted on Google Google
Eric Fox’s profile picture
Eric Fox’s
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Sam and his team built our loft extension to a high standard. They involved the building inspectors at every step of the way, and creatively found solutions to unexpected problems. They are very skilled, and worked with great professionalism - arriving on time every day, and keeping the lines of communication clear.
Posted on Google Google
clive stewart profile picture
clive stewart
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Right choice builders did an excellent job on my kitchen renovation they were very approachable and kept me informed at every stage 👍
Posted on Google Google
Mei Wong profile picture
Mei Wong
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We recently had our loft converted and home renovated by Right Choice Builders, and we’re extremely happy with the results. The team was reliable, efficient, and completed the work to a high standard. Communication was clear throughout, and they kept everything tidy and on schedule. The finished space looks fantastic – solid workmanship and great attention to detail. Highly recommend for anyone looking for a trustworthy and skilled building team.
Posted on Google Google
Mariam Layla Yahya profile picture
Mariam Layla Yahya
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
So happy with the renovation work done by Sami. New kitchen, bathroom, and the knocked through walls have completely transformed the space. He was friendly, reliable, and really paid attention to detail. It honestly feels like a brand new home, deffo five stars!

What the Council Looks At Under Prior Approval

Planning drawings and project paperwork laid out on a desk

Prior approval is not a full planning application, but the council can only approve it after considering specific matters: transport, contamination, flooding, noise from nearby commercial premises, the effect of nearby industrial uses on the new residents, the loss of ground floor commercial use in a conservation area, and whether every habitable room has adequate natural light.

Homes created through permitted development must also meet the nationally described space standard. Article 4 directions in parts of London remove the right altogether, so we check the position for the building before any design is paid for.

Building Regulations for New Homes in an Old Building

New loft staircase fitted above the existing stairs

A building that becomes homes must meet the building regulations for dwellings: fire separation between flats and a protected escape route, sound insulation between units, ventilation, insulation to the standard for a change of use, and new drainage and services. Older commercial buildings often need new windows, new floor and wall build-ups and a full replacement of the services.

The building is surveyed before the quote is prepared, including an asbestos survey, which is usually required before a strip-out of an older commercial building.

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

Bedroom stripped out during a full house renovation

Send us details of the building

The address, its current use and any floor plans are enough to check the route. We reply with a written price and book your free site survey within 24 hours.

Get your conversion price

Or call 07551 003647, every day 9am to 5pm.

Your Conversion Quote

The quote is set out by building element and by unit, for your appraisal.

The total includes VAT, with surveys, separation work and utility connections shown separately.

Ground floor stripped to the joists during a whole house renovation
The sections of your quote
  • Asbestos survey and strip-out
  • Structural alterations
  • Fire and acoustic separation
  • Windows and natural light
  • Insulation and ventilation
  • Kitchens and bathrooms
  • Services and separate metering
  • Common areas and entrances
  • Building control and certificates
What moves the price

The condition of the building, the number of units, the amount of new glazing needed to light the rooms, and the separation and services work.

Your Change of Use Conversion, Step by Step

  1. Survey and Route Check

    Within 24 hours of your call we survey the building and check its use, planning history and any Article 4 direction.

  2. Prior Approval or Planning

    The prior approval or planning application is prepared and submitted, with the space and light standards designed in.

  3. Building Regulations and Surveys

    The building regulations design is approved and the asbestos and structural surveys completed.

  4. Strip-Out and Conversion

    The building is stripped, divided into homes with fire and sound separation, and the services installed.

  5. Completion and Certificates

    Sound testing, building control sign-off and certificates for each new home.

Questions About Change of Use Conversions

Can an office be converted to flats without planning permission?

Often through prior approval rather than full planning, if the building has been in commercial, business or service use for the previous two years and no Article 4 direction applies. The council still considers specific matters, including natural light and noise.

Is there a size limit on prior approval conversions?

Not since March 2024, when the 1,500 square metre limit and the vacancy requirement were removed. The two-year use requirement still applies.

Do permitted development flats have to meet space standards?

Yes. Homes created through permitted development must meet the nationally described space standard, and every habitable room must have adequate natural light.

What is an Article 4 direction?

A council decision that removes specific permitted development rights in an area. Several London boroughs have used them to remove the commercial to residential right in parts of their area.

What building regulations apply?

The building regulations for dwellings, including fire separation and escape, sound insulation between flats, ventilation and insulation, plus drainage and services.

Is an asbestos survey needed?

For most older commercial buildings, yes. An asbestos refurbishment and demolition survey is required before the strip-out, so any asbestos is removed safely first.

Book Your Free Site Survey

Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

Or call 07551 003647
Completed home extension exterior built by Right Choice Builders

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    The Right Route Before the Right Build

    Change of use projects are won or lost on the planning route. The survey checks the building's use and history before the design starts, so the scheme is built on a sound approval.

    Send us the address and its current use, and the survey is booked within 24 hours.

    07551 003647
    Book Your Survey Free, no obligation, and the advice is yours to keep.