Skip to content
Family-run for 28 yearsCheckatrade 9.71 out of 10 (opens in a new tab)FMB memberGas Safe registered
07551 003647 Open nowEvery day, 9am to 5pm
07551 003647 Open nowEvery day, 9am to 5pm Get a price

HMO Compliance Upgrades for Landlords

The works an existing HMO needs to pass a licence application, a renewal or a council inspection: fire safety, room sizes, kitchens and bathrooms, electrics and the paperwork that proves it.…

Councils across London are inspecting HMOs more closely, and licence conditions often come with a schedule of works and a deadline. Getting them done properly, quickly and with the right certificates is what keeps the licence and the rent.

Send us the council’s schedule or the licence conditions, and a survey is booked within 24 hours of your call.

Book a Survey Within 24 Hours

Free and without obligation, anywhere across London and Surrey.

FMB inspected member. 28 years in the trade. Call 07551 003647.

New loft staircase fitted above the existing stairs

From the Council's Schedule to a Compliant House

A compliance upgrade starts from what the council has asked for, a schedule of works attached to a licence, an improvement notice after an inspection, or the conditions of a renewal, and from what the house actually needs once it is surveyed. Often that is fire safety, an under-sized bedroom, a kitchen or bathroom that falls short of the amenity standards, or electrics that will not pass an inspection.

We price the work item by item against the schedule, carry it out with our own trades, including our NAPIT registered electricians and Gas Safe registered engineers, and provide the certificates you send back to the council.

South East London bedroom renovation with fitted wardrobes

Common Compliance Works

These are the items that appear most often on council schedules for HMOs.

Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 4 options.

New loft staircase fitted above the existing stairs

Fire Doors and Escape Routes

Protecting the way out Read more Close

Replacing doors onto the escape route with fire doors and self-closers, upgrading the walls and ceilings around the stairs to be fire-resisting, and sealing gaps where services pass through.

Room with a dividing wall before structural alteration work

Fire Alarm Upgrades

Detection to the right grade Read more Close

Installing or upgrading an interlinked fire alarm system to the grade the council’s guidance requires for the size of the HMO, with heat detection in the kitchen and emergency lighting where needed.

Newly finished bedroom with an en-suite shower room

Room Sizes and Layout

Making every room count Read more Close

Where a bedroom falls below the minimum of 6.51 square metres for one person or 10.22 for two, walls are moved or rooms repurposed so every letting room meets the standard.

Bathroom with a double vanity unit and twin mirrors

Kitchens, Bathrooms and Electrics

Amenities to the council standard Read more Close

Adding cooking facilities, sinks, storage or bathrooms to meet the amenity standards for the number of tenants, and bringing the electrics to a condition that passes the five-yearly inspection.

What Our Customers Say on Google

Every review below comes straight from our Google Business Profile, in the customer's own words.

Posted on Google Google
Stacy profile picture
Stacy
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
It is always hard to find a reliable and trust worthy tradesman! you hear so many stories about cowboy builders and it puts you off getting work done. Sami was recommended to me by a friend who he had worked for before. I am so glad that I was put in touch with him! the work was completed within the time frame, under the budget and more importantly to an exceptional standard!
Posted on Google Google
Eric Fox’s profile picture
Eric Fox’s
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Sam and his team built our loft extension to a high standard. They involved the building inspectors at every step of the way, and creatively found solutions to unexpected problems. They are very skilled, and worked with great professionalism - arriving on time every day, and keeping the lines of communication clear.
Posted on Google Google
clive stewart profile picture
clive stewart
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Right choice builders did an excellent job on my kitchen renovation they were very approachable and kept me informed at every stage 👍
Posted on Google Google
Mei Wong profile picture
Mei Wong
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We recently had our loft converted and home renovated by Right Choice Builders, and we’re extremely happy with the results. The team was reliable, efficient, and completed the work to a high standard. Communication was clear throughout, and they kept everything tidy and on schedule. The finished space looks fantastic – solid workmanship and great attention to detail. Highly recommend for anyone looking for a trustworthy and skilled building team.
Posted on Google Google
Mariam Layla Yahya profile picture
Mariam Layla Yahya
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
So happy with the renovation work done by Sami. New kitchen, bathroom, and the knocked through walls have completely transformed the space. He was friendly, reliable, and really paid attention to detail. It honestly feels like a brand new home, deffo five stars!

Meeting the Licence Deadline

Illustration: structural loft drawings calculations and itemised quote

Licence conditions and improvement notices come with dates, and missing them can lead to fines, a civil penalty or the loss of the licence. We read the schedule with you at the survey, flag anything that is unclear or that may need agreeing with the council, and programme the works so they are finished before the deadline.

Where tenants are in occupation, the work is planned room by room so they can stay in the house, with notice given in line with their tenancy agreements and the fire safety maintained throughout.

The Paperwork That Closes the Schedule

Planning drawings and project paperwork laid out on a desk

A council will normally want evidence that each item has been done: certificates for fire doors and the fire alarm, an electrical installation condition report, gas safety records and sometimes building control sign-off. Private landlords must also have the electrics inspected at least every five years and the gas checked every year.

We collect the certificates as the work is completed and give you a set that matches the council’s schedule item by item, ready to send back.

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

Your Compliance Upgrade, Step by Step

  1. Survey Against the Schedule

    Within 24 hours of your call we survey the house against the council's schedule or licence conditions.

  2. Itemised Price and Programme

    Each item is priced separately and programmed to finish before the council's deadline.

  3. Works With Tenants in Place

    The work is carried out room by room, with fire safety maintained and tenants kept informed.

  4. Testing and Certification

    Fire alarms, electrics and gas are tested and certified, and any building control sign-off obtained.

  5. Evidence Pack for the Council

    You receive the certificates set out against the council's schedule, ready to send back.

Questions About HMO Compliance Works

Can you work from the council's schedule of works?

Yes. We survey the house against the schedule, price each item separately and programme the works to meet the council’s deadline.

Can tenants stay in the house during the works?

Usually, yes. The work is planned room by room, with notice given to tenants and the fire safety of the house kept in place throughout.

What if a bedroom is too small?

A room under 6.51 square metres cannot be let to one adult under a mandatory licence. Often a wall can be moved or two rooms reconfigured; otherwise the room is repurposed. We look at the options at the survey.

How often do the electrics and gas need checking?

Private landlords must have the electrical installation inspected at least every five years and a gas safety check every twelve months, with the reports given to tenants.

What happens if the works are not done?

The council can impose fines or civil penalties, take enforcement action or refuse or revoke the licence. Finishing the works on time, with evidence, avoids that.

Do you provide the certificates the council asks for?

Yes. We provide the fire door and fire alarm certificates, the electrical and gas certificates and any building control sign-off, set out against the council’s schedule.

Book Your Free Site Survey

Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

Or call 07551 003647
Completed home extension exterior built by Right Choice Builders

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    Compliant, Certified and On Time

    A schedule of works is easier to deal with than it looks once each item is priced and programmed. The survey turns the council's list into a plan with a finish date.

    Send us the council's schedule, and the survey is booked within 24 hours.

    07551 003647
    Book Your Survey Free, no obligation, and the advice is yours to keep.