South London House Renovations, Rebuilt From the Structure Out

The keys are yours, and so is everything the survey warned you about…

The 1970s wiring, the damp patch by the front door, the kitchen at the back that has not changed since the last owner but one. A whole house renovation by Right Choice Builders strips the property back to its structure, rewires and replumbs it with our own trades, brings it up to today's standards, and hands it back with the certificates that prove it, on one itemised quote and one programme.

The survey lifts floorboards and opens a ceiling before anything is priced, because the money in a renovation hides in the places you cannot see from the estate agent's photographs.

Book a Free Survey Visit

Free and without obligation, anywhere across South London.

FMB inspected member. Own electricians, gas engineers and plumbers. Call 07551 003647.

South London house renovation stripped back internally with temporary supports in place

House Renovations Designed, Rebuilt and Certified by One Team

Right Choice Builders carries out whole house renovations across South London, from Peckham, Dulwich and Lewisham to Croydon, Mitcham, Wimbledon and Sutton, on Victorian and Edwardian terraces, interwar semis and flats.

Each renovation runs in the right order under one project manager, with the rewire, plumbing and gas done and certified by our own NAPIT and Gas Safe registered trades, and a 12-month workmanship warranty at the end.

House renovation construction drawing A line drawing of a house section marked for complete fabric and interior renewal, with the existing structure dimensioned and the roof covering marked for renewal. ExistingRenew roofComplete fabric and interior renewal 06DETAIL Renovations RCB-A006NTS · REV A

From Strip-Out to Snagging: What a Full Renovation Covers

The phrase covers three different jobs, and the difference between them is what you pay for.

The survey tells you which one your house needs, and the quote is itemised so you can see where one becomes the other.

Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all three levels.

Completed kitchen renovation with island by Right Choice Builders

Refurbishment

Kitchens, bathrooms and finishes Read more Close

A refurbishment replaces the kitchen, the bathrooms and the finishes. It is the smallest of the three jobs, and the survey will tell you whether it is all your house needs before anything is priced.

Internal wall framing going in during a full house renovation in South London

Renovation

Wiring, plumbing, heating and layout as well Read more Close

A renovation does everything a refurbishment does and also renews the wiring, the plumbing, the heating and the layout, which is why the walls and floors come open and the work happens in a fixed order.

Room stripped back to brick and timber during a South London house rebuild

Rebuild

Bare brick, with windows and floors replaced Read more Close

A rebuild takes the house to bare brick and replaces everything, including the windows and the floors. The quote is itemised, so you can see exactly where a renovation becomes a rebuild.

What a whole house renovation includes

A whole house renovation takes the property back to its brick and joists and rebuilds everything the next thirty years will depend on. That means stripping out the old kitchen, bathrooms, ceilings and finishes; any structural work, such as opening up the ground floor or putting back the support under a chimney breast a previous owner removed; the roof covering, gutters and windows where they are due; a full rewire and new consumer unit; new plumbing and heating with the boiler moved to where it should be; insulation to the floors, walls and roof where the regulations require it; plastering throughout; new kitchen and bathrooms; flooring; and decoration.

Where the plan also includes opening up the ground floor, an extension at the same time or converting the loft, it is designed and priced as one job so the structure and the services are done once.

Front room during plastering work on a South London house renovation

Why the Order of Works Matters More Than the Finishes

A renovation done in the wrong order means paying for the same work twice, and the order is fixed by what has to dry and what has to be covered.

Fresh plaster needs four to six weeks to dry before it can be painted.

The survey settles the electrical scope before the quote, because a rewire after decoration costs the decoration twice.

Free survey visit, no obligation Book a survey

Nine stages, each one waiting on the last

Read the order of works
  1. Drawings and permissions

    Nothing is stripped out until the drawings are fixed and the permissions that apply to your house are in hand.

  2. Strip out

    The old kitchen, bathrooms, ceilings and finishes come out, which is also when the house shows what it has been hiding.

  3. Structural work

    The steel over a new opening is fabricated to order with a lead time of around three weeks, and everything waits for it.

  4. Roof, gutters and windows

    These are done next so the house is dry before anything inside is finished.

  5. First fix plumbing and electrics

    The new pipework and the new wiring go into the open walls and floors while there is still nothing covering them.

  6. Insulation

    Insulation follows the first fix, to the floors, walls and roof where the regulations require it.

  7. Plastering

    Only then is the house plastered, and the plaster then needs four to six weeks to dry before it can be painted.

  8. Second fix and finishes

    Second fix electrics and plumbing, the kitchen, the bathrooms, tiling, flooring and decoration follow in that order.

  9. Snagging

    The snagging list is walked with you before the final payment.

Why the rewire happens early

We rewire while the walls are open, because a rewire after decoration costs the decoration twice. That is why the survey settles the electrical scope before the quote is written rather than after the strip out has started.

The wait people underestimate

Fresh plaster needs four to six weeks to dry before it can be painted, and that wait is the most underestimated part of any renovation, because rushing it means paint that peels and tiles that lift.

What South London Houses Hide Under the Floor and Behind the Plaster

Artex ceilings 1970s wiring Chimney breast removed Lead supply pipe

The price of a renovation hides in three places: under the floors, inside the walls and above the ceilings, so the survey lifts two floorboards and opens a ceiling before a figure is written down.

On the Victorian and Edwardian terraces across Peckham, Lewisham, Camberwell and Dulwich, what we usually find is a lead water supply pipe that needs replacing, wiring from the 1970s that has to come out in full, water-damaged ceilings, and a chimney breast taken out upstairs by a previous owner with nothing holding up the stack above it.

Building control will want that stack supported with a steel or approved brackets before it is plastered over.

Three things turn up often enough that the survey looks for them by name, and each one changes what the quote says.

All three are closed. Open any of them to read what we usually find and what happens next.

Services and structure

4 findingsWhat the strip out reveals. The supply pipe, the wiring, the ceilings and the chimney breast a previous owner took out.
Lead water supply pipe
Common in houses of this age and replaced as part of the renovation.
Wiring from the 1970s
It has to come out in full rather than be added to, which is why the rewire happens while the walls are open.
Water-damaged ceilings
Found once the strip out starts, and taken down rather than patched.
An unsupported chimney breast
Taken out upstairs by a previous owner with nothing holding up the stack above it. Building control will want it supported with a steel or approved brackets before it is plastered over.

Asbestos

4 findingsAnything built or refurbished before 2000. Where it usually sits, and the survey that finds it before a wall is touched.
Artex ceilings
Artex almost certainly contains asbestos if it went on before 1985.
Old floor tiles
Another of the three places it usually turns up in these houses.
Pipe lagging
The third, and the easiest to miss because it sits out of sight.
The survey that finds it
A refurbishment and demolition survey before the strip out removes the biggest single cause of mid-project surprises, and we arrange it before a wall is touched.

Damp

3 findingsSolid walls built to breathe. Why the fix is the cause first, and breathable materials afterwards.
A bridged damp proof course
These houses have an original slate or bitumen course from the 1870s onward, now cracked or bridged by a raised path, a cement render or a flower bed.
The cause, fixed first
A cleared gutter, a lowered ground level, a reinstated course.
Breathable materials afterwards
Cement render and vinyl paint trap the moisture the wall was built to release, and internal insulation applied without thought does the same.

Each of these is settled at the survey rather than found halfway through, which is what keeps the itemised quote from turning into a running total.

Ground floor stripped back to timber floor joists during a South London renovation

No Planning Permission Does Not Mean No Certification

Most renovations need no planning application, since replacing what is there inside the house is not development.

Four sets of rules still apply, and each one produces a certificate a buyer's solicitor will ask for when you come to sell.

4 Sets of rules that still apply
25% The point where the insulation standard changes
Three sections

The four certificates a renovation produces

Four rules
  • Part P. The rewire is notifiable and is certified by our own NAPIT registered electricians.
  • FENSA. Replacement windows and doors carry a FENSA certificate.
  • Building control. Any structural work is inspected and ends with a completion certificate.
  • Approved Document L. Renovated walls, floors and roofs are insulated to the improved standard where practical.

The quarter rule that decides the insulation

One threshold

Where a wall, floor or roof is being renovated with more than a quarter of it exposed, Approved Document L requires it to be insulated to the improved standard where practical. This is why the insulation is designed in at the survey rather than argued about at the plastering stage.

A wall, floor or roof being renovated 25%

The banded zone is where the improved standard applies. The graphite bar marks the quarter, and the ticks mark every 20 per cent.

Conservation areas and listed buildings

Two routes

Conservation area

Extra rules Windows and exterior

Conservation areas across Southwark, Lewisham and Greenwich bring extra rules on windows and on the outside of the house, which the survey checks before the drawings are fixed.

Listed building

8 to 13 weeks Decision time

A listed building needs consent for windows, internal walls and sometimes the services, with decisions taking 8 to 13 weeks.

That wait sits before the build, not inside it, so it is built into the programme from the start.

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

Whole house renovation completed in Greater London, front exterior

Send us photos, get a price

Snap the rooms you want changed, one photo each is plenty. We reply with a written price and book your free home survey within 24 hours.

Get your renovation price

Or call 07551 003647, every day 9am to 5pm.

Your Renovation Quote, Itemised From Strip-Out to Decoration

The quote arrives within one working day of your survey and drawings, and runs to nine sections in the order the work happens.

The total is stated including VAT, each item is its own line, and the exclusions section names what the figure leaves out, so nothing is added afterwards.

South East London house stripped back during a major home renovation
The nine sections of your quote
  • Strip out and site set-up
  • Structural work
  • Roof and windows
  • First fix electrics and plumbing
  • Insulation and plastering
  • Second fix
  • Kitchen and bathrooms
  • Floors and decoration
  • Compliance and certification
What moves the price

What moves the price is what the survey finds first, then the extent of the rewire and the plumbing, then the number of bathrooms, then the roof, then the kitchen and finishes you supply.

Access comes last and matters more than people expect on a terrace, where every skip load goes out through the front door and the council charges for skip licences and parking suspensions. Each of those is its own line, so you can see which one is doing the work.

What is included and excluded

The exclusions section names what the figure leaves out, normally the kitchen units, sanitaryware and flooring you prefer to choose yourself.

The kitchens and bathrooms are fitted by our own trades under the same programme, so the certificates arrive with the rooms.

The quote is built from a specification agreed before the strip out, down to the sanitaryware and the tile, because choosing during the build is what turns an itemised price into a running total.

How a Full Renovation Runs From Survey to Completion Certificate

  1. A Survey That Looks Beneath Floors and Above Ceilings

    Sami or one of the team lifts boards, opens a ceiling, tests the wiring, traces the water supply and looks at the roof and the damp proof course, then tells you what the house needs and what it hides.

  2. Drawings, Calculations and the Asbestos Survey

    Drawings and the structural engineer's calculations are produced under one contract or priced from yours, and the refurbishment and demolition survey is arranged before the strip out.

  3. Permissions, Building Control and Party Wall Notices

    Building control is notified for the structural work, conservation area or listed building consent is sought where it applies, and party wall notices go out where a shared wall or chimney is involved.

  4. Your Itemised Quote Within One Working Day

    Nine sections, VAT included, with the programme agreed in writing.

  5. The Build, Inspections and Certified Handover

    As an industry guide, a full renovation of a three-bedroom terrace takes 16 to 28 weeks on site depending on the structural scope, with the family living in adding around a fifth to a third to that. Your own programme is stated in the quote, and you receive the completion certificate, the electrical, gas and FENSA certificates and a 12-month workmanship warranty.

Living in the House While It Is Rebuilt Around You

Most of our renovation customers stay in the house, and the way to make that work is floor by floor rather than room by room, with the family moved between floors as the work moves.

Strip out and first fix

These are the hard weeks, and the programme puts them first and closes them fast.

Once the house is plastered

The rest is finishes, and life gets easier every week.

Read more about living in the house during the work

One kitchen and one bathroom are kept live at every stage, so there is always somewhere to cook and somewhere to wash.

We accommodate most requests, from working around shift patterns to keeping one room sealed and untouched for a home office.

Your project manager gives you one number to ring, and tells you the night before what happens tomorrow.

Staying in the house adds time to the programme, which is priced and planned openly rather than discovered later.

Completed interior renovation with bay window by Right Choice Builders

See Full House Refurbishments in Lewisham, Sutton and Surbiton

Our portfolio shows a full house refurbishment in Lewisham, a house renovation in Sutton, a renovation in Surbiton and a complete home transformation in Woodfields, each with photographs of the finished rooms. Customers on Bark and Yell describe a full rewire, a renovation of a newly bought property in Camberwell, and a team that turned up every day and finished within the agreed time and budget.

“Sami and his team did the rewire of our property.”

Bark review
Those reviews name Sami, who leads the team on site.
  • 5 stars on Google
  • 9.71 out of 10 on Checkatrade

House Renovations Across South London, Surrey and Kent

We renovate houses and flats across South London and Surrey, from townhouses and mansion flats in Knightsbridge, Belgravia, Chelsea and Kensington to family homes in Fulham, Wimbledon, South Croydon and Purley.

Where the roof is due at the same time, a new roof covering is priced and built under the same programme.

Questions Homeowners Ask Before Renovating a Whole House

Do I Need Planning Permission to Renovate a House?

Usually not, because replacing kitchens, bathrooms, wiring, plumbing and finishes inside the house is not development. Planning comes in where the outside changes, where the house is in a conservation area or listed, or where an extension or loft is added, and building control applies to the structural work either way.

How Long Does a Full House Renovation Take?

As an industry guide, 16 to 28 weeks on site for a three-bedroom terrace, depending on how much structure is involved and whether the house is occupied, with the drawing and survey stage before that. Your own programme is stated in writing with the quote.

Should I Rewire During a Renovation?

If the wiring is from the 1970s or earlier, has round-pin sockets or an old fuse board, yes, and the time to do it is while the walls and floors are open. Our NAPIT registered electricians rewire, fit a new consumer unit and certify the installation under Part P, so it is done once.

Can We Live in the House During the Work?

Yes, and most customers do. We work floor by floor, keep one kitchen and one bathroom live throughout, and agree the sequence around your household, which adds some time to the programme and is priced and planned openly.

Could There Be Asbestos in My House?

If it was built or refurbished before 2000, possibly, most often in Artex ceilings, old floor tiles and pipe lagging. We arrange a refurbishment and demolition survey before the strip out, and any material found is removed by a licensed contractor before our trades start.

Do You Fit the Kitchen and Bathrooms Too?

Yes. The kitchen and bathrooms are fitted by our own plumbers and electricians at the second fix stage, so the certificates arrive with the rooms, and you choose the units and sanitaryware, which are listed as exclusions on the quote.

I Am a Landlord. Should the Renovation Take the House to EPC C?

Yes, if you can. From 1 October 2030 every privately rented home must reach EPC C or an equivalent under the new rating method, with a cost cap of £10,000 per property, and a house rated C before October 2029 stays compliant until that certificate expires. A renovation that already has the walls and floors open is the cheapest moment to add the insulation, glazing and heating controls that get it there, so we design the work with the target in mind and say what it will and will not achieve.

Is there something else you would like to ask?

Ask Our Team

Book Your Free Site Survey

Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

Or call 07551 003647
South East London bedroom renovation with fitted wardrobes

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    The finishes are what you see, but the renovation is what you will never see again once the plaster is on: the wiring, the pipework, the support under the chimney breast, the insulation and the damp course that decide whether the house is still right in ten years. Spend the attention there, and the finishes take care of themselves.

    The Work That Matters Most Happens Before the Plaster

    Tell us the house, what the survey said and what you want it to become, and the survey visit will tell you what it needs and what it hides.

    07551 003647
    Book Your Free Survey Visit Free, no obligation, and the advice is yours to keep.