Full House Renovations in London and Surrey
A full house renovation takes the whole house back to its structure and rebuilds it to today's standards: new wiring, plumbing and heating, insulation, kitchens and bathrooms, and the finishes, in one programme by one team.…
Full renovations are where the order of work matters most. Done in the right sequence, strip out, structure, services, plaster, then finishes, each trade builds on finished work; done out of order, new plaster gets cut for cables and new floors get lifted for pipes.
We renovate houses across London and Surrey, from family homes in Wimbledon and Richmond to period townhouses in Kensington, Chelsea and Belgravia. It starts with a survey within 24 hours of your call that looks behind the surfaces before the scope is fixed.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
Every Part of the House, in the Right Order
A full house renovation replaces or upgrades everything that wears out or falls behind: the electrics, the plumbing and heating, the plaster, the windows, the kitchen and bathrooms, and often the layout as well, with walls moved or opened up while the house is stripped. It is the right choice when a house has not been modernised for decades, or when you are buying a property to make your own.
Our own trades carry the work from the strip-out to the decoration, under one project manager and one programme. Building control inspects the structural and regulated work, and the handover pack includes every certificate the house will need when it is next sold.

What a Full Renovation Covers
Most renovations follow the same four stages. The survey sets out what each one will involve in your house.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 4 options.
Strip-Out and Structure
Back to brick and joists
Read more
Close
The house is stripped back, revealing the condition of the joists, the walls and the roof. Any structural work, such as removing walls, new steels, repairs to rotten timbers or underpinning, happens now, while everything is exposed.
Electrics, Plumbing and Heating
New services throughout
Read more
Close
A full rewire to the current regulations, new plumbing and a heating system sized for the house, often with the boiler moved or replaced by a heat pump. It all goes in before the walls are plastered, so nothing has to be cut out later.
Kitchens and Bathrooms
Fitted and certified together
Read more
Close
Kitchens and bathrooms are fitted by our own plumbers and electricians, so the certificates come with the finished rooms. Layouts are fixed early, because they decide where the pipes and cables run.
Finishes and Decoration
Floors, joinery and paint
Read more
Close
Flooring, doors, skirting, fitted joinery and decoration complete the house, followed by a snagging walk-round with you and the handover.
What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
Look Behind the Surfaces Before You Are Quoted

In an older house, the cost of a renovation depends on what is behind the plaster and under the floor: the age of the wiring, the condition of the joists, signs of damp or rot, and, in houses built before 2000, whether any asbestos is present. Before a strip-out, an asbestos refurbishment survey is a legal requirement, and it is arranged as part of the project.
The survey opens up where it can, and the quote sets out clearly what is known and what is a provisional allowance, so if the strip-out reveals something new, you see its cost before the work goes ahead.
Bringing an Older House Up to Standard

Renovating gives the chance to fix the things that make older houses cold and expensive to run. Where walls, floors or roofs are substantially renovated, the building regulations require their insulation to be upgraded, and we plan it in from the start, together with draught-proofing and ventilation so the house stays dry.
The electrics are rewired to the current wiring regulations and certified by our NAPIT registered electricians, gas work is carried out by our Gas Safe registered engineers, and building control signs off the regulated work, so the house leaves the project with a full set of certificates.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
How Much Does a Full House Renovation Cost?
A full renovation is priced at about £750 per square metre of floor area, so the size of the house sets the starting point: around £57,000 to £63,000 for a three-bedroom terrace and £93,000 to £102,000 for a three-bedroom detached house, including VAT.
If the wiring, plumbing and plaster are sound, a medium renovation or a single item from the list below may be all the house needs.
| Work | What's included | Guide price (inc VAT) |
|---|---|---|
| Full renovation, 3-bed terrace (about 80 m²) | Strip-out, full rewire and replumb, new heating, replastering throughout, kitchen, bathroom, floors | £57,000 – £63,000 |
| Full renovation, 3-bed semi (about 95 m²) | As above | £68,000 – £75,000 |
| Full renovation, 3-bed detached (about 130 m²) | As above | £93,000 – £102,000 |
| Medium renovation, 3-bed | New kitchen and bathroom, partial rewire, replastering, decoration | £30,000 – £45,000 |
| Cosmetic refresh, 3-bed | Redecoration, new flooring, minor repairs | £10,000 – £20,000 |
| Full rewire | 3-bed house, new consumer unit, certificate | £8,000 – £10,000 |
| Heating | New boiler, pipework and radiators | £5,000 – £9,000 |
| Replastering | Whole house, walls and ceilings | £5,000 – £9,000 |
| Windows | Whole house, uPVC double glazing | £6,000 – £11,000 |
Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.
Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.
Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.

Send us photos of the house as it is now
A few photos of each floor and any agent's particulars or floor plan are enough to start. We reply with a written price and book your free site survey within 24 hours.
Get your renovation priceOr call 07551 003647, every day 9am to 5pm.
Your Renovation Quote, Itemised
The quote is set out by stage and by room, so you can see where the budget goes.
Known work is priced in full; anything that cannot be seen until the strip-out is shown as a clearly labelled provisional allowance.

The sections of your quote
- Asbestos survey and strip-out
- Structural work and repairs
- Electrical rewire
- Plumbing and heating
- Windows and doors
- Insulation and plastering
- Kitchen fitting
- Bathroom fitting
- Flooring, joinery and decoration
- Building control and certificates
What moves the price
The condition of the structure and services once exposed, any layout changes, the heating system, and the specification of the kitchen, bathrooms and finishes. Fittings you choose are shown as allowances you can adjust.
Your Full Renovation, Step by Step
-
A Survey Within 24 Hours of Your Call
We walk every room, open up where we can, and agree with you what the renovation needs to achieve.
-
Scope, Design and Approvals
The scope is written room by room, with drawings and building regulations approval for any structural or layout changes.
-
Strip-Out and Structure
After the asbestos survey, the house is stripped back and any structural work and repairs are carried out.
-
Services, Plaster and Fit-Out
New electrics, plumbing and heating go in, the walls are plastered, and kitchens and bathrooms are fitted.
-
Finishes and Handover
Floors, joinery and decoration are completed, snags put right, and the certificates handed over.
Can You Live in the House During a Full Renovation?
Sometimes, if the work is phased, but most clients move out for a full renovation, because it is faster, safer and costs less. We plan the programme around your choice at the start.
If you move out
The whole house is worked on at once and the programme is at its shortest.
If you stay
The work is phased floor by floor, keeping a kitchen, a bathroom and bedrooms in use.
See Our Completed Renovations
Our portfolio includes a full house renovation in South Croydon, a house renovation in Sutton, a renovation in Surbiton and a renovation and garden office on Western Road, Wimbledon.
Full Renovations on Video
A full renovation in South Croydon with before and after footage, and finished houses in Surbiton and Sutton.
Questions About Full House Renovations
How long does a full house renovation take?
It depends on the size of the house and the scope, and the programme is set out in writing with the quote. The biggest variables are structural work and layout changes, and whether the house is empty during the work.
Do I need planning permission to renovate?
Internal renovation usually does not need planning permission, unless the house is listed or the work changes its outside in a conservation area. Building regulations approval is needed for structural work, rewiring, new heating and many other parts of a renovation.
What if the strip-out finds a problem?
The quote shows provisional allowances for what cannot be seen in advance. If the strip-out reveals something new, such as rotten joists, you see the cost before the work goes ahead.
Is an asbestos survey necessary?
For a house built before 2000, yes. An asbestos refurbishment survey is required by law before a strip-out, so that any asbestos is identified and dealt with safely before work starts.
Can you change the layout as part of the renovation?
Yes, and it is the best time to do it, while the house is stripped. Removing walls, moving the kitchen or adding a bathroom is designed at the start and approved where building regulations apply.
Do I get certificates at the end?
Yes: the building control completion certificate, electrical installation certificates, gas safety records and any warranties for the work and the products, ready for when you next sell or remortgage.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
Renovate Once, in the Right Order
A full renovation is the chance to fix everything a house needs at the same time, in the sequence that means nothing has to be done twice. The survey sets out that sequence before the first wall is opened.
Call or WhatsApp 07551 003647, or email sales@rightchoicebuilders.co.uk. Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office. Page last reviewed: October 2026.




