Kitchen Renovations in London and Surrey
Kitchen renovations by one team: the old kitchen stripped out, the layout, wiring, plumbing and gas, the walls, ceiling and floor redone, then the units, worktops and appliances fitted and finished.…
A new kitchen is only as good as what sits behind it. Most of the work in a kitchen renovation happens before a single unit goes in: moving the sink and the cooker, new circuits for the appliances, extraction to the outside, a level floor and straight walls for the units to sit against.
We do that work and the fitting ourselves, so nobody is waiting for another trade. The first step is a survey, booked within 24 hours of your call.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
One Team From Strip-Out to the Last Worktop
A kitchen renovation usually starts with the old kitchen coming out completely, back to the bare walls and floor. That is when the services are put where the new layout needs them: the waste and water to a new sink position, a dedicated circuit for the oven and the hob, sockets at worktop height, the gas run to the hob by a Gas Safe registered engineer, and a cooker hood ducted to the outside.
Then the room is made good: replastered, the ceiling and lighting renewed, and the floor levelled so the units sit true. The units, worktops, splashback and appliances go in last, and the electrics are tested and certified. You can choose your own kitchen and have us fit it, or we can supply it as part of the price.

What a Kitchen Renovation Can Include
Most projects are one of these, or a step towards the next.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 3 options.
Like-for-Like Replacement
A new kitchen in the same layout
Read more
Close
The units, worktops and appliances replaced in the same positions, with the services checked and updated where they need it. The quickest and lowest-cost route to a new kitchen.
New Layout in the Same Room
Island, peninsula or a new run
Read more
Close
The sink, hob or oven moved to suit an island or a new run of units, with the drainage, gas and electrics rerouted under the floor and through the walls to match.
Kitchen With Renovated Room
Walls, ceiling, floor and lighting
Read more
Close
The kitchen together with the room around it: replastering, a new ceiling with recessed lighting, underfloor heating and a new floor finish, so the whole room is finished at once.
What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
Getting the Services Right Behind the Units

Once the old kitchen is out, the services are laid out for the new plan. A new oven, hob or induction circuit is added from the consumer unit, which is notifiable work that our registered electricians certify. Gas to the hob is installed or capped by a Gas Safe registered engineer, and the sink waste is given a proper fall to the drain, which decides how far it can move.
A cooker hood extracting to the outside, rather than recirculating, keeps steam and cooking smells out of the rest of the house. Its duct route is planned before the units go in, through the wall or between the joists.
Before and After: Preparing the Room

Older kitchens often hide uneven floors, tiles over tiles, and walls that are not square. New units and stone or quartz worktops need a level floor and true walls, so the room is prepared first: old tiling removed, walls replastered and the floor levelled or replaced.
If you would like the kitchen to open into the dining room or extend into the garden, that is best decided now, before the services are moved. See our pages on open-plan kitchen-diners and single-storey rear extensions.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
How Much Does a Kitchen Renovation Cost?
Supplying and fitting a mid-range kitchen, with the units, worktops and appliances, typically costs £10,000 to £20,000 including VAT. Where the rest of the ground floor needs work at the same time, a medium renovation covers the kitchen, the bathroom and the rooms around them.
If the room itself is too small, an extension usually gives the kitchen its space.
| Work | What's included | Guide price (inc VAT) | Time on site |
|---|---|---|---|
| Kitchen | Mid-range units, worktops and appliances, supply and fit | £10,000 – £20,000 | – |
| Medium renovation, 3-bed | New kitchen and bathroom, partial rewire, replastering, decoration | £30,000 – £45,000 | – |
| Single-storey rear extension | A larger kitchen, 20–30 m², finished and ready for the kitchen | £65,000 – £110,000 | 12–16 weeks |
Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.
Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.
Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.

Send us a photo of your kitchen as it is
A photo or two of the kitchen and a rough idea of the layout you want are enough to start. We reply with a written price and book your free site survey within 24 hours.
Get your kitchen priceOr call 07551 003647, every day 9am to 5pm.
Your Kitchen Quote
The building work, the services and the kitchen itself are priced separately, so you can compare the kitchen with one you buy elsewhere.
The total includes VAT, and the kitchen, worktops and appliances are shown as their own lines.

The sections of your quote
- Strip-out and waste removal
- Plumbing and waste to the new layout
- Electrics: circuits, sockets and lighting
- Gas to the hob
- Extraction to the outside
- Plastering and the ceiling
- Floor levelling and finish
- Units, worktops and splashback
- Appliances fitted and tested
What moves the price
Whether the sink and the hob move, the worktop material, the number of appliances, underfloor heating, and whether the walls and ceiling need replastering.
Your Kitchen Renovation, Step by Step
-
A Survey Within 24 Hours of Your Call
We measure the room, check the services, and talk through how you cook and how many people use the kitchen.
-
Layout and Quote
The layout is agreed, with the positions of the sink, hob and appliances, and the itemised quote follows.
-
Strip-Out and Services
The old kitchen comes out and the plumbing, gas, electrics and extraction are run to the new layout.
-
Walls, Ceiling and Floor
The room is replastered, the lighting installed and the floor levelled for the new units.
-
Fitting and Sign-Off
Units, worktops and appliances go in, everything is tested, and the electrical certificate is handed over.
Living Without a Kitchen for a While
The kitchen is the room a household misses most, so the weeks without it are planned.
Before the strip-out
We help you set up a temporary kitchen elsewhere in the house, with a fridge, a kettle and a microwave.
While the work goes on
The kitchen is sealed off from the rest of the house, and the water and power to other rooms stay on.
Before the units go in
The dusty work is finished first, so the new kitchen is fitted into a clean room.
See a Kitchen We Have Fitted
Our portfolio includes a new kitchen installation in Catford, and our full house renovation page shows kitchens renovated as part of a whole house.
Watch a Kitchen We Fitted
A completed kitchen renovation in Catford, and a finished house in Surbiton with its new kitchen.
Questions About Kitchen Renovations
How much does a new kitchen cost to supply and fit?
A mid-range kitchen, with units, worktops and appliances supplied and fitted, typically costs £10,000 to £20,000 including VAT. Moving the sink or hob, replastering and new flooring are priced as separate lines.
Do I need planning permission for a new kitchen?
No. Renovating a kitchen inside the house does not need planning permission. A listed building needs listed building consent for many internal changes, so check before work starts.
Does a kitchen renovation need building regulations approval?
Fitting units does not, but some of the work around them is covered: new electrical circuits are notifiable and certified by our registered electricians, gas work is done by a Gas Safe registered engineer, and removing a wall to open up the kitchen needs approval.
Can you fit a kitchen I have bought myself?
Yes. We can fit a kitchen you have chosen from a supplier, or supply one as part of the price. Either way, the services and the preparation are done by our own team.
Can the sink move to an island?
Usually, yes. The waste runs under the floor to the drain, and it needs a steady fall, so the survey checks the floor construction and the distance to the drain first.
Can we stay at home while the kitchen is done?
Yes, most people do. We help you set up a temporary kitchen in another room, and the work area is sealed off from the rest of the house.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
A Kitchen Built From the Walls Out
The units are what you see; the services, the walls and the floor are what make them last. The survey looks at both, so the quote covers the whole job.
Call or WhatsApp 07551 003647, or email sales@rightchoicebuilders.co.uk. Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office. Page last reviewed: October 2026.