Structural Alterations and Knock-Throughs in London and Surrey
Structural alterations done safely: load-bearing walls removed, rooms knocked through and chimney breasts taken out, with the house above held up by steel designed by a structural engineer and signed off by building control.…
Opening up a ground floor is one of the most effective changes you can make to an older house, turning separate front and back rooms, or a closed kitchen, into the open space most families now want. It is also work where the details matter, because the wall you remove is carrying the floors, and sometimes the roof, above it.
It starts with a survey within 24 hours of your call, which confirms what the wall is carrying before anything is designed.
Free and without obligation, anywhere across London and Surrey.
FMB inspected member. 28 years in the trade. Call 07551 003647.
Opening Up the House Without Weakening It
A structural alteration removes or changes part of the structure that carries the load of the house: a load-bearing wall, a chimney breast, a section of an external wall for new doors, or the floor for a new staircase. The load has to go somewhere else, so a structural engineer designs a new beam, usually steel, the padstones it sits on and, where needed, new posts and foundations.
Our own team props the structure, removes the wall and installs the steel, often in a few days, and building control inspects the work before it is covered. The house is left with a completion certificate that shows the alteration was done properly, which matters as much at resale as the open space does.

Common Structural Alterations
Each one needs a structural engineer’s design and building regulations approval.
Tap a card to read the detail. Swipe sideways, or use the arrows, to move through all 4 options.
Knocking Through Reception Rooms
Front and back rooms as one
Read more
Close
The classic change in a Victorian or Edwardian house: the wall between the front and back reception rooms is removed and replaced with a steel beam, creating one long, light room from the bay window to the garden.
Open-Plan Kitchen and Dining
Removing the kitchen wall
Read more
Close
Taking out the wall between the kitchen and the dining room creates a single space for cooking and eating. The steel is sized for what sits above, and the kitchen layout is planned around where the beam and any posts fall.
Chimney Breast Removal
Reclaiming the alcoves
Read more
Close
Removing a chimney breast frees floor space, but the chimney above must be supported by steelwork designed by an engineer. Where the breast is on a party wall, a party wall notice is needed before the work starts.
New Openings in External Walls
Wider doors to the garden
Read more
Close
Enlarging an opening in an external wall for wider doors or a new window needs a lintel or steel designed for the load above, and approval from building control.
What Our Customers Say on Google
Every review below comes straight from our Google Business Profile, in the customer's own words.
How a Load-Bearing Wall Is Removed Safely

Before any wall comes out, the structure above it is supported on temporary props and needles, so nothing relies on the wall during the work. The wall is then removed, padstones are built to spread the load at each end, and the steel beam is lifted into place, packed tight to the structure above and checked.
The engineer’s calculations set the size of the steel and the padstones, and building control approves them before the steel is ordered. The beam is then boxed in with fire-resisting board, because the regulations require structural steel to be protected, before plastering and decoration.
Party Walls, Chimneys and the Neighbours

Many structural alterations in terraced and semi-detached houses touch a party wall: a steel bearing into the shared wall, or a chimney breast that is part of it. Under the Party Wall Act, notices are served on the neighbour at least two months before work to a party structure, and a surveyor draws up an award if they do not consent.
Removing a chimney breast also means the chimney stack above, and any breast on the upper floors, must be properly supported. Older methods such as metal gallows brackets alone are not always accepted, so the engineer designs the support and building control approves it.
Checked, registered and reviewed
Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.
How Much Does a Knock-Through Cost?
Removing a load-bearing wall between two rooms costs about £12,000 to £15,000, depending on the length of the opening and what the wall carries. The price covers the structural engineer’s design, the steel beam and padstones, building control, and making good the walls, ceiling and floor afterwards.
Chimney breast removals and new openings in external walls are priced from the survey.
| Work | What's included | Guide price (inc VAT) |
|---|---|---|
| Kitchen to dining room | Engineer's design, steel beam, building control, making good | About £15,000 |
| Kitchen to laundry room | Engineer's design, steel beam, building control, making good | About £12,000 |
Guide prices include VAT at 20%. Every home is different, so your price is set out in a written, itemised quote after a free site survey.
Included: standard materials, labour and waste clearance. Second fix (sockets, switches, doors, skirting, taps) is to a basic standard; upgraded fittings are priced on request.
Not included unless stated: architect and structural engineer fees, planning and party wall costs, kitchens, specialist glazing, and anything hidden that only shows once work starts.

Send a photo of the wall you want to remove
Photos of the wall from both sides, and of the room above it, are enough to start. We reply with a written price and book your free site survey within 24 hours.
Get your priceOr call 07551 003647, every day 9am to 5pm.
Your Structural Alteration Quote
The quote follows the engineer's design, with the structural work and the making good priced separately.
The total includes VAT, and the engineer's and building control fees are shown as their own lines.

The sections of your quote
- Structural engineer's design and calculations
- Building control fees
- Party wall notices
- Temporary propping and protection
- Removing the wall or chimney breast
- Padstones, steel beam and posts
- Fire protection to the steel
- Making good: plaster, floor and decoration
What moves the price
The length of the opening and the load above it, whether new posts and foundations are needed, any party wall work, and how much making good the rooms need afterwards.
Your Structural Alteration, Step by Step
-
Survey Within 24 Hours
We confirm what the wall carries, check the floors and walls above and below, and look at the party walls.
-
Engineer's Design and Approval
The engineer designs the steel and padstones, and building regulations approval is obtained before the steel is ordered.
-
Notices and Preparation
Party wall notices are served where needed, and the rooms are cleared and protected.
-
Propping, Removal and the Steel
The structure is propped, the wall removed, the padstones built and the steel installed and checked by building control.
-
Making Good and Sign-Off
The steel is fire-protected, the walls, ceiling and floor are made good, and the completion certificate is issued.
Living at Home During the Work
Most structural alterations can be done while you live in the house. The rooms affected are sealed off, and the noisy, dusty part is usually over in a few days.
During the removal
The rooms are sealed with dust screens and the house is protected from the dust.
Once the steel is in
Making good and decoration follow, with the rest of the house in use.
See Our Completed Renovations
Many of our renovations include structural work, such as the full house renovation in South Croydon and the complete home transformation.
Watch Our Projects on YouTube
Finished projects filmed on site by our own team. Each video opens on our YouTube channel, where you can see the rest.
-
Video
South Croydon full renovation, before and after
(opens on YouTube in a new tab)
-
Video
House extension and garden outhouse in Wimbledon
(opens on YouTube in a new tab)
-
Video
Completed kitchen in Catford
(opens on YouTube in a new tab)
-
Video
Completed works in Surbiton
(opens on YouTube in a new tab)
Questions About Structural Alterations
How do I know if a wall is load-bearing?
It is not always obvious, so the survey checks what sits above the wall, which way the floor joists run, and whether there is a wall in the same position on the floor above. The structural engineer confirms it before anything is designed.
Do I need planning permission to remove a wall?
Not for internal walls in most houses, unless the house is listed. Building regulations approval is needed for removing a load-bearing wall, and the work is inspected.
Can I stay in the house during the work?
Usually, yes. The rooms affected are sealed off and the removal and steel installation normally take a few days, followed by making good.
Will I need a party wall agreement?
If the steel bears into a party wall, or a chimney breast on a party wall is removed, yes. Notices are served at least two months before the work.
Can a chimney breast be removed?
Yes, but the chimney and any breasts above must be supported by steelwork designed by an engineer and approved by building control, and party wall notices may be needed.
Why does the steel need to be boxed in?
The building regulations require structural steel to be protected from fire, usually with fire-resisting plasterboard, so it keeps carrying the load for long enough to escape in a fire.
Book Your Free Site Survey
Send us the details and a photo or drawing if you have one. It helps us price the job accurately.
Or call 07551 003647
More Space Without Building Anything New
The space you want may already be inside the house, divided by a wall that does not need to be there. The survey tells you what it is carrying and what it takes to remove it.
Call or WhatsApp 07551 003647, or email sales@rightchoicebuilders.co.uk. Right Choice Builders Group Ltd, registered office 7 Bell Yard, London WC2A 2JR. We work at your property across South London and Surrey; there is no walk-in office. Page last reviewed: October 2026.




