Skip to content
Family-run for 28 yearsCheckatrade 9.71 out of 10 (opens in a new tab)FMB memberGas Safe registered
07551 003647 Open nowEvery day, 9am to 5pm
07551 003647 Open nowEvery day, 9am to 5pm Get a price

South London Roofing: Re-Roofs, Flat Roofs and New Roofs

A damp patch on the bedroom ceiling, three slipped slates in the gutter after a windy night, and two roofers who have told you two different things: patch it, or replace it…

Right Choice Builders builds new roofs, re-roofs and flat roofs across South London with the same team that builds the lofts and extensions beneath them, tells you plainly which of the two answers is true for your roof, and prices the work in nine itemised sections from scaffold to ridge, with building control notified for you.

The survey looks at the roof from the loft as well as the scaffold, because the rafters and the nails decide whether it is a repair or a replacement.

Book a Free Roof Survey

Free and without obligation, anywhere across South London.

FMB inspected member. Same team as the loft or extension below. Call 07551 003647.

Roof tiles being fixed to new battens on a South London pitched roof

Roofs Built, Replaced and Signed Off by the Same Team as the House Below

Right Choice Builders replaces and builds roofs across South London, from Peckham and Lewisham to Croydon, Wimbledon and Sutton: pitched re-roofs in slate, clay or concrete tile, flat roofs in GRP, EPDM or felt, new roofs over lofts and extensions, and roof repairs of a proper size such as a chimney, a valley or a section of covering.

Every roof is built to the membrane, batten, ventilation and insulation standards building control checks, notified for you where the work requires it, and carries a 12-month workmanship warranty.

Roofing construction drawing A line drawing of a house section through a pitched roof, showing the new covering and insulation over the rafters, a chimney stack, two rooflights, and the rainwater pipes at each end. New covering and insulationRainwaterRoof span 11DETAIL Roofing RCB-A011NTS · REV A
Scaffolded South London house during roof replacement work

When a Roof Is Worth Repairing and When It Is Worth Replacing

A slate roof on a Victorian or Edwardian house in Dulwich, Peckham or Lewisham has usually lasted around a hundred years, and it fails at the nails, not the slates.

Once the iron nails have rusted through, every slate on the roof is waiting to slip.

The survey looks at the roof from the loft as well as the scaffold, because the rafters and the nails decide whether it is a repair or a replacement.

Free roof survey, no obligation Book a survey

The two honest answers, and when each one applies

When we say replace

Where the fixings have gone, the battens are soft or the felt beneath has perished, we say replace, because the honest answer costs you less over ten years than the comforting one.

A patch that holds this winter is money spent on a roof that will need stripping anyway.

When we say repair

Where the roof is sound and the fault is local, a slipped section after a storm, a chimney that needs rebuilding, a valley or a flashing that has failed, a flat roof on an outrigger that ponds, we repair it properly, and we say so.

What we do not do is the small job, the odd tile and the quick patch, because a roof deserves a team that will still be there for the next one.

The survey settles which you need, from the loft as well as from the ladder, since the rafters and the underside of the covering tell the truth the outside hides.

New roof tiles and lead flashing being fitted on a Greater London dormer

What a Re-Roof Includes, From the Rafters Up

The covering is the weather skin; the roof is what sits under it. A re-roof strips the old covering and battens, checks every rafter and repairs or replaces the ones the survey found.

  • Breathable membrane to BS 5250
  • Treated battens graded to BS 5534
  • Slates and tiles fixed to BS 8000-6
  • Code 4 lead at every abutment

Find out what your roof needs

Book your free roof survey
What goes on under the covering, and what is renewed while the scaffold is up

Membrane and ventilation

A breathable membrane is laid to the ventilation guidance in BS 5250 so the roof space can breathe without condensation, with a 50 millimetre ventilation path at the eaves and ridge where the loft is cold.

Battens and fixings

New treated battens graded to BS 5534 go on at the gauge the covering needs, and the slates or tiles are fixed to BS 8000-6 with the head nails and clips the exposure calls for.

The rafter load check

Where the new covering is heavier than the old, which it usually is when concrete tile replaces slate, the rafters are checked for the load before the covering is chosen, not after.

Leadwork, gutters and insulation

Flashings to the chimney, the abutments and the party wall in Code 4 lead, valleys relined, and the soakers and step flashing that stop the joins leaking, since most leaks on a South London terrace start at a flashing and not a slate.

Fascias, soffits and guttering are renewed while the scaffold is up, and the loft insulation is topped up to the 270 millimetres or so that meets the current standard, because a re-roof of more than a quarter of the roof has to leave the roof insulated to today's target and not yesterday's.

Flat Roofs Built Warm, Not Cold

Fall to the outlet Warm build-up above the deck Deck, firrings and joists Outlet Upstand

A flat roof that ponds has the wrong falls, and no covering fixes falls, so a new flat roof starts with the deck and the firrings that give it a fall to the outlet.

Where more than a quarter of a flat roof is replaced, the regulations require the insulation to be brought up to the current target as well, which in practice means a warm roof, with rigid insulation above the deck and the covering over it, so the deck stays warm and the condensation that rots cold roofs from the inside never forms.

GRP, EPDM and high performance felt each suit different roofs, and we say which suits yours.

Every one of them goes on a warm build-up with the right falls, the right outlets and a proper upstand at every wall and rooflight.

All three are closed. Open any of them to read what it suits and how long it lasts.

GRP

25 to 30 yearsGlass reinforced polyester. A rigid covering laid in place, and what it suits on a South London roof.
What it suits
Smaller roofs with upstands and details, where the covering has to turn a lot of corners.
How long it lasts
25 to 30 years, as an industry guide rather than a guarantee.

EPDM

25 to 50 yearsA single rubber sheet. Laid in one piece, and the roofs it is the right answer for.
What it suits
Larger, simpler roofs, because the sheet goes down in one piece with very few joins.
How long it lasts
25 to 50 years, as an industry guide rather than a guarantee.

High performance felt

10 to 20 yearsBuilt up felt. Where budget leads the decision, and on repairs to older roofs.
What it suits
Budget work, and repairs to older roofs that are otherwise sound.
How long it lasts
10 to 20 years, as an industry guide rather than a guarantee.

The build-up beneath matters more than the covering, which is why the falls, the outlets and the upstands are settled at the survey and before any covering is chosen.

Completed flat roof extension with skylights built by Right Choice Builders

Checked, registered and reviewed

Some of these are schemes that inspect our work. Others are places where customers leave reviews. The caption under each logo tells you which.

  • Federation of Master BuildersBuilders are vetted and independently inspected before they can join. Any member can be checked on the FMB website.

  • NAPIT ApprovedA government-approved scheme. Registered installers sign off their own electrical and heating work under Building Regulations.

  • Gas Safe RegisterBy law, only a Gas Safe registered engineer may work on gas. The register is free for you to search.

  • CheckatradeMembers pass up to 12 checks before they are listed, and every review is verified with the customer who wrote it.

  • BarkA marketplace for local services. Reviews are written by customers after the job is done.

What Our Customers Say on Google

Every review below comes straight from our Google Business Profile, in the customer's own words.

Posted on Google Google
Stacy profile picture
Stacy
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
It is always hard to find a reliable and trust worthy tradesman! you hear so many stories about cowboy builders and it puts you off getting work done. Sami was recommended to me by a friend who he had worked for before. I am so glad that I was put in touch with him! the work was completed within the time frame, under the budget and more importantly to an exceptional standard!
Posted on Google Google
Eric Fox’s profile picture
Eric Fox’s
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Sam and his team built our loft extension to a high standard. They involved the building inspectors at every step of the way, and creatively found solutions to unexpected problems. They are very skilled, and worked with great professionalism - arriving on time every day, and keeping the lines of communication clear.
Posted on Google Google
clive stewart profile picture
clive stewart
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Right choice builders did an excellent job on my kitchen renovation they were very approachable and kept me informed at every stage 👍
Posted on Google Google
Mei Wong profile picture
Mei Wong
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We recently had our loft converted and home renovated by Right Choice Builders, and we’re extremely happy with the results. The team was reliable, efficient, and completed the work to a high standard. Communication was clear throughout, and they kept everything tidy and on schedule. The finished space looks fantastic – solid workmanship and great attention to detail. Highly recommend for anyone looking for a trustworthy and skilled building team.
Posted on Google Google
Mariam Layla Yahya profile picture
Mariam Layla Yahya
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
So happy with the renovation work done by Sami. New kitchen, bathroom, and the knocked through walls have completely transformed the space. He was friendly, reliable, and really paid attention to detail. It honestly feels like a brand new home, deffo five stars!

The Roof Over a Loft or an Extension Is Part of the Same Job

Most of the roofs we build are new: the dormer, the hip-to-gable or the mansard over a loft conversion, the lean-to or the flat roof with a lantern over an extension, and the whole roof on a house being renovated from top to bottom.

One design

The roof is designed with the structure beneath it, and the steels and the insulation are one calculation.

One team

The same trades who built the room build the roof over it.

Read more about why that matters when the first rain comes

Nobody hands the leak between two contractors when the first rain comes, because the roof and the room below it were priced, built and signed off under one contract.

Where the roof is being replaced as part of a house being renovated top to bottom, it is priced and built under the same programme.

That is also why the leadwork, the fascias and the gutters appear on the same quote as the covering rather than arriving as an extra later.

Replace More Than a Quarter of a Roof and Building Control Is Involved

Replacing more than 25 percent of a roof's area counts as renovating a thermal element under the Building Regulations.

That means the insulation has to be upgraded to the current Part L target, and building control has to be notified.

0.16 Pitched roof insulated at ceiling level
0.18 Flat roof

Both are the approximate Part L targets in W/m2K, and the share of the roof being replaced decides whether they apply.

Three sections

What crossing a quarter requires

Six points
  • The insulation is upgraded to the current Part L target
  • Building control has to be notified
  • Around 0.16 W/m2K for a pitched roof insulated at ceiling level
  • Around 0.18 W/m2K for a flat roof
  • The same rule applies where more than a quarter of a flat roof is replaced
  • The loft insulation is topped up to around 270 millimetres while the scaffold is up

Where the threshold sits

0 to 100 percent

Almost every full re-roof crosses the line, and so does a single slope on most houses, which is why the survey measures the area to be replaced before the quote is written.

Share of the roof area replaced 25%

The orange band is the range where the notification and the insulation upgrade both apply. The scale runs from 0 to 100 percent of the roof area, and the ticks mark every 20.

Who notifies, and what you are handed

One certificate

Self-certification through a scheme

Some roofers self-certify through a scheme, which is the route you will see on many roofing websites.

Direct to the local authority

We notify the local authority's building control directly, book the inspection and hand you the compliance certificate.

That certificate is the document a buyer's solicitor asks for, and the one a re-roof without it cannot produce.

Your Roofing Quote, Itemised From Scaffold to Ridge

The quote arrives within one working day of the survey and runs to nine sections in build order.

The total is stated including VAT, and the jobs worth doing while the scaffold is up are priced as their own lines, so you can take them or leave them before it goes up rather than pay for the scaffold twice.

Completed tiled roof and rebuilt chimney on a South London house
The nine sections of your quote
  • Scaffold and access
  • Strip and disposal
  • Structural repairs to rafters
  • Membrane and battens
  • Covering
  • Leadwork and chimney
  • Fascias, soffits and gutters
  • Insulation and ventilation
  • Compliance and certification
What moves the price

What moves the price is the covering first, since natural slate costs more than concrete tile and needs a closer gauge, then the size and pitch of the roof, then what the strip reveals in the rafters, then the chimney and the leadwork.

Finally there is the scaffold, which on a terrace often has to bridge a neighbour's yard.

What to do while the scaffold is up

Scaffold is the cost you cannot bring back, so the quote also prices the work that should be done while it is up: the chimney rebuilt or capped, the flashings renewed, the gutters replaced, the rooflight fitted.

Where you are thinking of solar panels or a rooflight, the re-roof is the time, since panels mounted on a covering with five years left have to come off again and go back on.

Each is its own line, so you can take it or leave it before the scaffold goes up.

How a Re-Roof Runs, From Survey to Certificate

  1. A Survey From the Loft and the Ladder

    We look at the covering, the fixings, the battens and the felt from above, and the rafters, the ridge and any daylight from the loft below, then tell you whether the roof needs repairing or replacing.

  2. Your Itemised Quote Within One Working Day

    Nine sections, VAT included, with the scaffold-up extras priced as their own lines and the programme agreed in writing.

  3. Notices, Scaffold and the Neighbour Told First

    Building control is notified where the roof area requires it, the scaffold is booked, and on a terrace the neighbour hears about the scaffold and any shared flashing before it goes up.

  4. Strip, Rebuild and Cover in Sequence

    The old covering comes off in sections so the house is never open overnight, the rafters are repaired, the membrane and battens go on, the covering follows, and the leadwork, fascias and gutters finish it.

  5. Inspection, Certificate and Warranty

    Building control inspects where the work is notifiable, the scaffold comes down, the gutters and paths are cleared, and you receive the compliance certificate and a 12-month workmanship warranty.

Tiled roof replacement detail on a South London house

See the Roofs We Built Over Lofts and Extensions

Our portfolio shows the dormer roof on the Sutton loft, the new roof over the Mitcham extension and the roofs on our full refurbishments in Lewisham and Surbiton.

Customers on Checkatrade and Bark describe a team that turned up every day, involved the building inspector at each stage and finished within the agreed time and budget. Those reviews name Sami, who leads the team on site.

  • 5 stars on Google
  • 9.71 out of 10 on Checkatrade

Roofing Across South London, Surrey and Kent

We build and replace roofs across South London, on the slate and clay roofs of the Victorian terraces in Peckham, Dulwich, Camberwell and Lewisham, and the butterfly roofs and parapets of the older stock.

We also work on the tiled roofs of the interwar semis across Croydon, Mitcham, Sutton and Wimbledon, and out into the Surrey and Kent borders.

Where the roof is being replaced as part of a full house renovation, it is priced and built under the same programme.

Completed tiled roof and chimney renovation on a London home

Send a photo of your roof

Snap the roof from the garden or the street, plus any damage inside. We reply with a written price and book your free roof check within 24 hours.

Get your roof price

Or call 07551 003647, every day 9am to 5pm.

Questions Homeowners Ask Before Replacing a Roof

Do I Need Building Regulations Approval to Replace My Roof?

Yes, where more than a quarter of the roof is being replaced, because the insulation has to be upgraded to the current standard and building control has to be notified. We notify the local authority directly, book the inspection and hand you the compliance certificate.

Slate, Clay or Concrete Tiles?

Natural slate suits Victorian and Edwardian houses and lasts longest at the highest price; clay tiles suit the interwar semis and hold their colour; concrete tiles cost least and are heaviest, which matters on old rafters. As a guide, natural slate lasts 80 to 100 years or more, clay tile 60 to 100, concrete tile 40 to 60, and on a flat roof EPDM 25 to 50, GRP 25 to 30 and felt 10 to 20; on every one of them the nails, battens and flashings fail first, which is why the build-up beneath matters more than the covering. We say which suits your roof, your rafters and your street at the survey.

Do You Do Roof Repairs?

Yes, where the repair is a proper job: a chimney, a valley, a run of flashing, a section of covering or a flat roof on an outrigger. We do not take on the odd tile or the quick patch, and where the fixings have gone we say replace. Where an old garage or outrigger roof is fibre cement from before 2000, it is treated as asbestos until proved otherwise and removed by a licensed contractor before anything new goes on.

GRP, EPDM or Felt for a Flat Roof?

All three work on a warm roof with the right falls. GRP is rigid and suits smaller roofs with upstands and details, EPDM is a single rubber sheet that suits larger simple roofs, and high performance felt suits budget and repairs to older roofs. The build-up beneath matters more than the covering, and we say which suits yours.

Do You Need Scaffolding for a Re-Roof?

Yes, on almost every re-roof, because the work is done from a platform and the regulations on working at height require it. The scaffold is priced as its own line, and the quote lists the jobs worth doing while it is up.

Can You Do the Chimney and Gutters at the Same Time?

Yes, and it is the time to do them, since the scaffold is already there. Chimney rebuilds or capping, new flashings, fascias, soffits and guttering are each priced as their own lines so you can add them without paying for the scaffold twice.

Is there something else you would like to ask?

Ask Our Team

Request a Free Quote

Send us the details and a photo of the roof or a survey if you have one. It helps us price the job accurately.

Or call 07551 003647
Completed pitched roof on a renovated bungalow, seen from the front

    Request a free quote

    Send us the details and a photo or drawing if you have one. It helps us price the job accurately.

    The Covering Is Not the Roof

    The slates or tiles are what you see from the street, but the roof is the membrane, the battens, the ventilation, the leadwork and the insulation beneath them, and every one of those is decided before the first slate goes on. Get those right and the covering lasts its full life; get them wrong and the best slate in South London leaks in five years.

    Tell us the house, what you can see from the ground and what you can see from the loft, and the survey will tell you whether it is a repair or a roof.

    07551 003647
    Book Your Free Roof Survey Free, no obligation, and the advice is yours to keep.